Refine Your Search

Topic

Author

Affiliation

Search Results

Journal Article

CFD Study of Ventilation and Carbon Dioxide Transport for ISS Node 2 and Attached Modules

2009-07-12
2009-01-2549
The objective of this study is to evaluate ventilation efficiency regarding to the International Space Station (ISS) cabin ventilation during the ISS assembly mission 1J. The focus is on carbon dioxide spatial/temporal variations within the Node 2 and attached modules. An integrated model for CO2 transport analysis that combines 3D CFD modeling with the lumped parameter approach has been implemented. CO2 scrubbing from the air by means of two ISS removal systems is taken into account. It has been established that the ventilation scheme with an ISS Node 2 bypass duct reduces short-circuiting effects and provides less CO2 gradients when the Space Shuttle Orbiter is docked to the ISS. This configuration results in reduced CO2 level within the ISS cabin.
Journal Article

Role of Power Distribution System Tests in Final Assembly of a Military Derivative Airplane

2009-11-10
2009-01-3121
Boeing has contracts for military application of twin engine airplanes generically identified in this paper as the MX airplane. Unlike previous derivatives, the MX airplanes are produced with a streamlined manufacturing process to improve cost and schedule performance. The final assembly of each MX airplane includes a series of integration tests, called factory functional tests (FFTs), which are modified from those of typical commercial versions and verify correctness of equipment installation and basic functionalities. Two airplanes have been through the production line resulting in a number of FFT lessons learned. Addressed are the power distribution lessons learned: 1) the expanded coverage of the basic automated power-on generation system test, 2) the need for a manual wire continuity test, 3) salient features of the power distribution tests, and 4) keys to make first pass power distribution test smooth and successful.
Journal Article

Self-Configuring Hybrid Duct System and Attachment Technologies for Environmental Control Systems

2009-11-10
2009-01-3277
Environmental Control Systems (ECS) ducts on airplanes are primarily fabricated from aluminum or thermoset composites, depending on temperature and pressure requirements. It is imperative to fabricate lightweight, cost effective, durable, and repairable systems with minimal tooling. It is also important that the duct systems are easy to assemble even with alignment issues resulting from structural variations, tolerance accumulation, variation from thermal expansion of different materials, and inherent duct stiffness. These requirements create an opportunity and need for a technology that can address all of these issues, while increasing performance at the same time. This report provides a background on current ECS ducting systems.
Technical Paper

Weathering of Thermal Control Coatings

2007-07-09
2007-01-3020
Spacecraft radiators reject heat to their surroundings. Radiators can be deployable or mounted on the body of the spacecraft. NASA's Crew Exploration Vehicle is to use body mounted radiators. Coatings play an important role in heat rejection. The coatings provide the radiator surface with the desired optical properties of low solar absorptance and high infrared emittance. These specialized surfaces are applied to the radiator panel in a number of ways, including conventional spraying, plasma spraying, or as an appliqué. Not specifically designed for a weathering environment, little is known about the durability of conventional paints, coatings, and appliqués upon exposure to weathering and subsequent exposure to solar wind and ultraviolet radiation exposure. In addition to maintaining their desired optical properties, the coatings must also continue to adhere to the underlying radiator panel.
Technical Paper

IVA/EVA Life Support Umbilical System

2007-07-09
2007-01-3228
For NASA's Constellation Program, an Intravehicular Activity (IVA) and Extravehicular Activity (EVA) Life Support Umbilical System (LSUS) will be required to provide environmental protection to the suited crew during Crew Exploration Vehicle (CEV) cabin contamination or depressurization and contingency EVAs. The LSUS will provide the crewmember with ventilation, cooling, power, communication, and data, and will also serve as a crew safety restraint during contingency EVAs. The LSUS will interface with the Vehicle Interface Assembly (VIA) in the CEV and the Suit Connector on the suit. This paper describes the effort performed to develop concept designs for IVA and EVA umbilicals, universal multiple connectors, handling aids and stowage systems, and VIAs that meet NASA's mission needs while adhering to the important guiding principles of simplicity, reliability, and operability.
Technical Paper

International Space Station (ISS) Carbon Dioxide Removal Assembly (CDRA) Desiccant/Adsorbent Bed (DAB) Orbital Replacement Unit (ORU) Redesign

2007-07-09
2007-01-3181
The Carbon Dioxide Removal Assembly (CDRA) is a part of the International Space Station (ISS) Environmental Control and Life Support (ECLS) system. The CDRA provides carbon dioxide (CO2) removal from the ISS on-orbit modules. Currently, the CDRA is the secondary removal system on the ISS, with the primary system being the Russian Vozdukh. Within the CDRA are two Desiccant/Adsorbent Beds (DAB), which perform the carbon dioxide removal function. The DAB adsorbent containment approach required improvements with respect to adsorbent containment. These improvements were implemented through a redesign program and have been implemented on units on the ground and returning from orbit. This paper presents a DAB design modification implementation description, a hardware performance comparison between the unmodified and modified DAB configurations, and a description of the modified DAB hardware implementation into the on-orbit CDRA.
Technical Paper

Analysis and Predicted Temperature Control of Crew Quarters added to Node 2 of the International Space Station

2007-07-09
2007-01-3071
Currently scheduled to be delivered to the International Space Station (ISS) in 2009, Crew Quarters (CQs) will be installed in the Node 2 Module. The CQs provide crewmembers with private space, a place to sleep, and minimal storage. Analysis is to be performed to determine if the United States Operational Segment (USOS) Node 2 can maintain temperature between 47°C and 62°C (65°F and 80°F) [units are CCGS with U.S unit in parenthesis] within the CQ. The analysis will concentrate on the nominal hot environmental case. Environmental heat is due to solar heating of the external shell of the ISS. Configurations including both three and four CQs are examined, as well as multiple configurations of the Low Temperature Loop (LTL) that flows through the Node 2 Common Cabin Air Assembly (CCAA). This paper describes the analysis performed to determine if Node 2 will be able to maintain cabin temperature between 47°C and 62°C (65°F and 85°F).
Technical Paper

Development of Portable and Flexible Track Positioning System for Aircraft Manufacturing Processes

2007-09-17
2007-01-3781
The Boeing Company has recently developed a portable positioning system based upon its patented flexible vacuum track technology, in support of its commitment to lean manufacturing techniques. The positioning system, referred to as Mini Flex Track, was initially developed as an inexpensive drilling system that minimizes machine setup time, does not require extensive operator training due to its simple user interface, is general purpose enough to be used in varying airplane applications, and meets strict accuracy requirements for aircraft manufacturing. The system consists of a variable length vacuum track that conforms to a range of contours, a two-axis numerically-controlled positioning carriage that controls machine motion, an additional rail perpendicular to the vacuum rail that provides transverse motion, and an end effector that can perform various tasks.
Technical Paper

Chemical Analysis of Potable Water and Humidity Condensate Collected During the MIR-21 Mission

1997-07-01
972462
The primary source of potable water planned for the International Space Station will be generated from the reclamation of humidity condensate, urine, and hygiene waters. It is vital to crew health and performance that this reclaimed water be safe for human consumption, and that health risks associated with recycled water consumption be identified and quantified. Only recently has data been available on the chemical constituents in reclaimed waters generated in microgravity. Results for samples collected during Mir-21 reveal that both the reclaimed water and stored water are of potable quality, although the samples did not meet U.S. standards for total organic carbon (TOC), total phenols, and turbidity.
Technical Paper

Zirconia Electrolysis Cells for Oxygen Generation from Carbon Dioxide for Mars In-Situ Resource Utilization Applications

1998-07-13
981655
A zirconia electroysis cell is an all-solid state (mainly ceramic) device consisting of two electrodes separated by a dense zirconia electrolyte. The cell electrochemically reduces carbon dioxide to oxygen and carbon monoxide at elevated temperatures (800 to 1000°C). The zirconia electrolysis cell provides a simple, lightweight, low-volume system for Mars In-Situ Resource Utilization (ISRU) applications. This paper describes the fabrication process and discusses the electrochemical performance and other properties of zirconia electrolysis cells made by the tape calendering method. Electrolytes produced by this method are very thin (micrometer-thick); the thin electrolyte reduces ohmic losses in the cell, permitting efficient operation at temperatures of 800°C or below.
Technical Paper

Integrated Air Interchange System Performance for Early Internatonal Space Station Assembly Missions

1998-07-13
981588
A multi-element fixed control volume integrated air interchange system performance computer model has been developed and upgraded for the evaluation/assessment of atmospheric characteristics inside the crew compartments of the mated Orbiter and International Space Station (ISS). In order to ensure a safe, comfortable, and habitable environment for all the astronauts during the Orbiter/ISS docked period, this model was utilized to conduct the analysis for supporting the early ISS assembly missions. Two ISS assembly missions #2A and #4A were selected and analyzed.
Technical Paper

Friction Stir Welding-A Revolutionary New Joining Method

1998-09-15
982149
Friction Stir Welding (FSW) can achieve high quality welds in aluminum alloys that are of interest to the aerospace industry (e.g. alloys 2014, 2219, 7050 and numerous aluminum-lithium alloys). The low distortion solid-phase welds exhibit metallurgical and mechanical properties, including fatigue, which are superior to conventional fusion welds achieved by arc processes. FSW, although a relatively new welding technique, has been systematically developed and proved by The Welding Institute (TWI) under contract to an international group of sponsors, one of which is The Boeing Company. To further validate the process, The Boeing Company conducted separate development activities including detailed mechanical testing of welds made from the FSW process.
Technical Paper

Laser Tracker Assisted Aircraft Machining and Assembly

2008-09-16
2008-01-2313
The patented (US 7,277,811 B1) Position Bar provides precise measurement, machining and drilling data for large Engineering and Tooling structure. The Position Bar also supports end item verification seamlessly in the same machining control code. Position Bar measurements are fast, accurate, and repeatable. The true centerline of the machine tool's spindle bearings are being measured to within .002 in a 20 foot cubic volume (20×20×20). True “I”, “J”, & “K” machine tool spindle positions are also precisely measured. Any Gantry or Post Mill Tool can be converted to a Coordinate Measurement Machine (CMM) with this laser tracker controlled Position Bar. Determinant Assembly (D.A.) holes, for fuselage and wing structures are drilled and then measured to within .006 in X, Y, & Z, over a 40 foot distance. Average laser tracker measurement time, per hole, is 2 seconds.
Technical Paper

Advanced Design Heat Pump/Radiator for EVA Suits

2009-07-12
2009-01-2406
Absorption cooling using a lithium chloride/water heat pump can enable lightweight and effective thermal control for Extravehicular Activity (EVA) suits without venting water to the environment. The key components in the system are an absorber/radiator that rejects heat to space and a flexible evaporation cooling garment that absorbs heat from the crew member, This paper describes progress in the design, development, and testing of the absorber/radiator and evaporation cooling garment. New design concepts and fabrication approaches will significantly reduce the mass of the absorber/radiator. We have also identified materials and demonstrated fabrication approaches for production of a flexible evaporation cooling garment, Data from tests of the system's modular components have validated the design models and allowed predictions of the size and weight of a complete system.
Technical Paper

Modification of the USOS to Support Installation and Activation of the Node 3 Element

2009-07-12
2009-01-2416
The International Space Station (ISS) program is nearing an assembly complete configuration with the addition of the final resource node module in early 2010. The Node 3 module will provide critical functionality in support of permanent long duration crews aboard ISS. The new module will permanently house the regenerative Environment Control and Life Support Systems (ECLSS) and will also provide important habitability functions such as waste management and exercise facilities. The ISS program has selected the Port side of the Node 1 “Unity” module as the permanent location for Node 3 which will necessitate architecture changes to provide the required interfaces. The USOS ECLSS fluid and ventilation systems, Internal Thermal Control Systems, and Avionics Systems require significant modifications in order to support Node 3 interfaces at the Node 1 Port location since it was not initially designed for that configuration.
Technical Paper

Development and Implementation of Sol-Gel Coatings for Aerospace Applications

2009-11-10
2009-01-3208
A family of water-based sol-gel coatings has been developed as an environmentally-friendly alternative to traditional aerospace finishing materials and processes. The sol-gel hybrid network is based on a reactive mixture of an organo-functionalized silane with a stabilized zirconium complex. Thin films of the material self-assemble on metal surfaces, resulting in a gradient coating that provides durable adhesion for paints, adhesives, and sealants. Use of the novel coating as a surface pretreatment for the exterior of commercial aircraft has enabled environmental, health, and safety benefits due to elimination of hexavalent chromium, and flight test and early fleet survey data support the laboratory observations that the sol gel coating reduces the occurrence of “rivet rash” adhesion failures. Modifications of the basic inorganic/organic hybrid network have yielded multifunctional coatings with promise for applications such as corrosion control and oxidation protection.
Technical Paper

Efficient Assembly Integration and Test (EAIT) Moves Theory to Practice at a System Level to Effect Lean Outcomes on the Shop Floor

2009-11-10
2009-01-3169
This paper will describe the Efficient Assembly Integration and Test (EAIT) system level project operated as a partnership among Boeing business units, universities, and suppliers. The focus is on the successful implementation and sharing of technology solutions to develop a model based, multi-product pulsed line factory of the future. The EAIT philosophy presented in this paper focuses on a collaborative environment that is tightly woven with the Lean Initiatives at Boeing's satellite development center. The prototype is comprised of a platform that includes a wireless instrumentation system, rapid bonding materials and virtual test of guidance hardware there are examples of collaborative development in collaboration with suppliers. Wireless tools and information systems are also being developed across the Boeing Company. Virtual reality development will include university partners in the US and India.
Technical Paper

Portable Fastener Delivery and Installation System

2003-09-08
2003-01-2953
The Portable Fastener Delivery System or PFDS, has been developed at the Boeing St. Louis facility to streamline the manual fastener installation process. The PFDS delivers various fasteners, on demand, through a delivery tube to an installation tool used by the operator to install the fasteners in an aircraft assembly. This paper describes the PFDS in its current configuration, along with the associated Huck® International (now Alcoa Fastening Systems) installation tooling, as it is being implemented on the F/A-18E/F Nosebarrel Skinning application. As a “portable” system, the PFDS cart can be rolled to any location on the shop floor it might be needed. The system uses a removable storage cassette to cache many sizes and types of fasteners in the moderate quantities that might be required for a particular assembly task. The operator begins the installation sequence by calling for the particular fastener grip length needed using a wireless control pendant.
Technical Paper

The State of ISS ATCS Design, Assembly and Operation

2003-07-07
2003-01-2513
The International Space Station (ISS) Active Thermal Control System (ATCS) (Ref. 1,2) has changed over the past several years to address problems and to improve its assembly and operation on-orbit. This paper captures the ways in which the Internal (I) ATCS and External (E) ATCS have changed design characteristics and operations both for the system currently operating on-orbit and the new elements of the system that are about to be added and/or activated. The rationale for changes in ATCS design, assembly and operation will provide insights into the lessons learned during ATCS development. The state of the assembly of the integrated ATCS will be presented to provide a status of the build-up of the system. The capabilities of the on-orbit system will be presented with a summary of the elements of the ISS ATCS that are functional on-orbit plus the plans for launch of remaining parts of the integrated ISS ATCS.
Technical Paper

Post-Flight Sampling and Loading Characterization of Trace Contaminant Control Subassembly Charcoal

2003-07-07
2003-01-2487
Trace chemical contaminants produced by equipment offgassing and human metabolic processes are removed from the atmosphere of the International Space Station's U.S. Segment by a trace contaminant control subassembly (TCCS). The TCCS employs a combination of physical adsorption, thermal catalytic oxidation, and chemical adsorption processes to accomplish its task. A large bed of granular activated charcoal is a primary component of the TCCS. The charcoal contained in this bed, known as the charcoal bed assembly (CBA), is expendable and must be replaced periodically. Pre-flight engineering analyses based upon TCCS performance testing results established a service life estimate of 1 year. After nearly 1 year of cumulative in-flight operations, the first CBA was returned for refurbishment. Charcoal samples were collected and analyzed for loading to determine the best estimate for the CBA's service life.
X