Refine Your Search

Topic

Affiliation

Search Results

Journal Article

Development and Testing of a Sorbent-Based Atmosphere Revitalization System 2008/2009

2009-07-12
2009-01-2445
The design and evaluation of a Vacuum-Swing Adsorption (VSA) system to remove metabolic water and metabolic carbon dioxide from a spacecraft atmosphere is presented. The approach for Orion and Altair is a VSA system that removes not only 100 percent of the metabolic CO2 from the atmosphere, but also 100% of the metabolic water as well, a technology approach that has not been used in previous spacecraft life support systems. The design and development of an Orion Crew Exploration Vehicle Sorbent Based Atmosphere Revitalization system, including test articles, a facility test stand, and full-scale testing in late 2008 and early 2009 is discussed.
Journal Article

Engineered Structured Sorbents for the Adsorption of Carbon Dioxide and Water Vapor from Manned Spacecraft Atmospheres: Applications and Testing 2008/2009

2009-07-12
2009-01-2444
Developmental efforts are seeking to improve upon the efficiency and reliability of typical packed beds of sorbent pellets by using structured sorbents and alternative bed configurations. The benefits include increased structural stability gained by eliminating clay bound zeolite pellets that tend to fluidize and erode, and better thermal control during sorption leading to increased process efficiency. Test results that demonstrate such improvements are described and presented.
Technical Paper

Integrated CO2 and Humidity Control by Membrane Gas Absorption

1997-07-14
972560
In a harmonized ESA/NIVR project the performance of membrane gas absorption for the simultaneous removal of carbon dioxide and moisture has been determined experimentally at carbon dioxide and humidity concentration levels representative for spacecraft conditions. Performance data at several experimental conditions have been collected. Removal of moisture can be controlled by the temperature of the absorption liquid. Removal of carbon dioxide is slightly affected by the temperature of the absorption liquid. Based on these measurements a conceptual design for a carbon dioxide and humidity control system for the Crew Transport Vehicle (CTV) is made. For the regeneration step in this design a number of assumptions have been made. The multifunctionality of membrane gas absorption makes it possible to combine a number of functions in one compact system.
Technical Paper

Columbus Active Thermal Control System - Final Integration, Test and Mission Preparation

2007-07-09
2007-01-3030
Columbus has been delivered to Kennedy Space Center (KSC) in summer 2006 for final integration, test and mission preparation. In the frame of these “last” phase activities also the Active Thermal Control System (ATCS) had to be finalized and prepared for the launch resp. mission. Due to unexpected late failures resp. malfunctions detected on component/unit level of the ATCS, refurbishment, integration / exchange of the relevant components and re-testing of their system level functions had to be done. Moreover, the still outstanding system level fluid leakage test of the ATCS had to be revised and completed. In addition to the required late refurbishment, integration and test activities, in certain cases also operational workarounds had to be evaluated. They should help to cope with similar contingency situations during operation of the ATCS on-orbit.
Technical Paper

Guidance for Trade Studies of Flight-Equivalent Hardware

2007-07-09
2007-01-3223
Spacecraft hardware trade studies compare options primarily on mass while considering impacts to cost, risk, and schedule. Historically, other factors have been considered in these studies, such as reliability, technology readiness level (TRL), volume and crew time. In most cases, past trades compared two or more technologies across functional and TRL boundaries, which is an uneven comparison of the technologies. For example, low TRL technologies with low mass were traded directly against flight-proven hardware without consideration for requirements and the derived architecture. To provide for even comparisons of spacecraft hardware, trades need to consider functionality, mission constraints, integer vs. real number of flight hardware units, and mass growth allowances by TRL.
Technical Paper

Development and Testing of a Sorbent-Based Atmosphere Revitalization System for the Crew Exploration Vehicle 2006/2007

2007-07-09
2007-01-3254
The design of a vacuum-swing adsorption process to remove metabolic water, metabolic carbon dioxide, and metabolic and equipment generated trace contaminant gases from the Orion Crew Exploration Vehicle (CEV) atmosphere is presented. For Orion, the approach is taken that all metabolic water must be removed by the Sorbent-Based Atmosphere Revitalization System (SBAR), a technology approach that has not been used in previous spacecraft life support systems. Design and development of a prototype SBAR, a facility test stand, and subsequent testing of the SBAR in late 2006 and early 2007 is discussed.
Technical Paper

Fully Operational FTIR Based Multi-Component Gas Analysis System for Spacecraft Cabin Air Monitoring

1998-07-13
981568
An advanced trace gas monitoring system for long duration manned space missions - such as the International Space Station - is discussed. The system proposed is a combination of a Fourier-Transform Infrared Spectrometer (FTIR) and a distributed ‘Smart Gas Sensor system (SGS). In a running multi-phase programme [1,2] the FTIR technology, applying novel analysis methods, has been demonstrated to handle multi-component gas measurements, including identification and quantification of 20 important trace gases in a mixture. In the current phase 3, initiated end of 1997, a fully operational FTIR technology demonstration model will be manufactured and tested. The SGS consists of an array of twenty electrically conductive polymer sensors supplemented with an array of quartz crystal microbalance sensors. The technology has been tested on the Russian MIR space station and is currently miniaturized into a second-generation flight model.
Technical Paper

Thermal Control Architecture of the Automated Transfer Vehicle

1998-07-13
981778
The Automated Transfer Vehicle (ATV) is a European Space Agency autonomous, expendable logistic transportation system for Low Earth Orbit. The ATV will be launched by Ariane 5 and its mission is to contribute to the logistic servicing of the International Space Station: via the delivery of a cargo (crew items, scientific experiments, spare parts..) as well as of fluids such as propellant, water and compressed air via the provision of an extra service consisting of retrieving the station wastes when departing (replacing the upcoming cargo) and getting rid of them through the final destructive atmospheric re-entry of the ATV itself via the contribution to the orbit control of ISS by providing a reboost and attitude control capability to the ISS. The ATV consists of a Spacecraft and an Integrated Cargo Carrier. The Spacecraft includes all subsystems necessary for the automated flight to the ISS and for the reboost, including the propellant tanks and the thrusters.
Technical Paper

Development and Testing of a Sorbent-Based Atmosphere Revitalization System for the Crew Exploration Vehicle 2007/2008

2008-06-29
2008-01-2082
The design of a Vacuum-Swing Adsorption (VSA) system to remove metabolic water and metabolic carbon dioxide from the Orion Crew Exploration Vehicle (CEV) atmosphere is presented. The approach for Orion is a VSA system that removes not only 100 percent of the metabolic CO2 from the atmosphere, but also 100% of the metabolic water as well, a technology approach that has not been used in previous spacecraft life support systems. The design and development of the Sorbent Based Atmosphere Regeneration (SBAR) system, including test articles, a facility test stand, and full-scale testing in late 2007 and early 2008 is discussed.
Technical Paper

Life Support Requirements and Technology Challenges for NASA's Constellation Program

2008-06-29
2008-01-2018
NASA's Constellation Program, which includes the mission objectives of establishing a permanently-manned lunar Outpost, and the exploration of Mars, poses new and unique challenges for human life support systems that will require solutions beyond the Shuttle and International Space Station state of the art systems. In particular, the requirement to support crews for extended durations at the lunar outpost with limited resource resupply capability will require closed-loop regenerative life support systems with minimal expendables. Planetary environmental conditions such as lunar dust and extreme temperatures, as well as the capability to support frequent and extended-duration Extra-vehicular Activity's (EVA's) will be particularly challenging.
Technical Paper

Columbus Launch Preparation - Final System ATCS Tests Summary and Lessons Learned

2008-06-29
2008-01-2033
Final preparation and configuration of the Columbus module at the Kennedy Space Center (KSC) required the performance of system level tests with the Active Thermal Control System (ATCS). These tests represented the very last system level activities having been concluded on the Columbus module before handover to NASA for space shuttle integration. Those very last tests, performed with the ATCS comprised the final ATCS Leakage Test, the final calibration and adjustment of the Water Flow Selection Valves (WFSV) and Water On/Off Valves (WOOV) as well as a sophisticated ATCS Residual Air Removal test. The above listed tests have been successfully performed and test data evaluated for verification closeout as well as input delivery for operational Flight Rules and Procedures. Some of the above mentioned tests have been performed the first time hence, a succeeding lessons learned collection followed in order to improve the perspectives of future tests.
Technical Paper

Evaluation of Commercial Off-the-Shelf Ammonia Sorbents and Carbon Monoxide Oxidation Catalysts

2008-06-29
2008-01-2097
Designers of future space vehicles envision simplifying the Atmosphere Revitalization (AR) system by combining the functions of trace contaminant (TC) control and carbon dioxide removal into one swing-bed system. Flow rates and bed sizes of the TC and CO2 systems have historically been very different. There is uncertainty about the ability of trace contaminant sorbents to adsorb adequately in a high-flow or short bed length configurations, and to desorb adequately during short vacuum exposures. This paper describes preliminary results of a comparative experimental investigation into adsorbents for trace contaminant control. Ammonia sorbents and low temperature catalysts for CO oxidation are the foci. The data will be useful to designers of AR systems for Constellation. Plans for extended and repeated vacuum exposure of ammonia sorbents are also presented.
Technical Paper

ATV THERMAL CONTROL: Architecture and Jules Verne First Flight Results

2009-07-12
2009-01-2474
After several years of development the first European Automated Transfer Vehicle (ATV) developed by ESA called Jules Verne completed successfully its seven-month ISS logistics mission. Launched the 9 March 2008 on an Ariane 5 launcher, the ATV performed the 3 April 2008 its rendezvous and docking to the International Space Station to which it remained attached for five months. This paper presents in a first part the ATV thermal control architecture based on a innovative active thermal control design built around 40 Variable Conductance Heat Pipes (VCHP) controlling the heat rejection and in a second part the in-flight thermal control behavior of the ATV Jules Verne observed during the seven months mission in both free flight and attached to ISS phases.
Technical Paper

DOMEX-2 Thermal Design, Testing and Commissioning in Support to the SMOS Mission

2009-07-12
2009-01-2375
In recent years there is growing interest, on the part of the remote sensing community, in using the Antarctic area, for calibrating and validating data of satellite-borne microwave radiometers. With a view to the launching of the ESA's SMOS satellite, which is a satellite designed to observe soil moisture over the Earth landmasses, salinity over the oceans and to provide observations over regions of ice and snow, an experimental activity called DOMEX was started at Dome-C Antarctica. The main scientific objectives of this activity are to provide microwave data for SMOS satellite calibration and in particular: the continuous acquisition of a calibrated time-series of microwave and thermal Infrared (8-14micron) emission over an entire Austral annual cycle, the acquisition of a long time-series of snow measurements and the acquisition of relevant local atmospheric measurements from the local weather station. This paper is focusing on the thermal design, analysis and testing of Domex-2.
Technical Paper

Human-rating Automated and Robotic Systems — How HAL Can Work Safely with Astronauts

2009-07-12
2009-01-2527
Long duration human space missions, as planned in the Vision for Space Exploration, will not be possible without applying unprecedented levels of automation to support the human endeavors. The automated and robotic systems must carry the load of routine “housekeeping” for the new generation of explorers, as well as assist their exploration science and engineering work with new precision. Fortunately, the state of automated and robotic systems is sophisticated and sturdy enough to do this work — but the systems themselves have never been human-rated as all other NASA physical systems used in human space flight have. Our intent in this paper is to provide perspective on requirements and architecture for the interfaces and interactions between human beings and the astonishing array of automated systems; and the approach we believe necessary to create human-rated systems and implement them in the space program.
Technical Paper

Thermal Testing of a Heat Switch for European Mars Rover

2009-07-12
2009-01-2573
A Heat Switch has been developed, namely a device able to autonomously regulate its own thermal conductance in function of the equipment dissipation and environmental heat sink conditions. It is based on a Loop Heat Pipe (LHP) technology, with a passive bypass valve which diverts the flow to the Compensation Chamber when needed for regulation purposes. The target application is the potential use on a Mars Rover thermal control system. The paper recalls the Heat Switch design, and reports the results of an extensive test campaign on the ground demonstrator. The performance of the device was found extremely satisfying, and often exceeded the system requirements.
Technical Paper

Thermal - Power - Software Development and Validation on ATV Vehicle

2009-07-12
2009-01-2558
Jules Verne (JV) is the name of the first Automated Transfer Vehicle (ATV) developed by ASTRIUM Space Transportation on behalf of European Space Agency (ESA). JV was launched the 9 March 2008 by ARIANE 5 and performed the 3 April 2008 its automatic rendezvous and docking to the International Space Station (ISS) to which it remained attached up to the 5 September 2008. In the meantime, JV has provided the ISS with dry and fluid cargo and performed one refueling, four ISS re-boosts and one Debris Avoidance Maneuver. JV completed its successful mission by offloading waste and was destroyed during its re-entry the 29 September 2008. Generally, development and verification of Power management rely on classical thermal and electrical engineering.
Technical Paper

ATV Thermal Operations for Jules Verne First Flight

2009-07-12
2009-01-2556
Jules Verne – the first ATV model developed by ASTRIUM on behalf of ESA – has been controlled by CNES Toulouse Control Centre from March to September 2008. The Engineering Support Team (EST) was in charge to provide System expertise and to propose relevant recommendations in case of off nominal situations. This paper deals with the operations carried out by the EST Thermal position during the JV flight, such as: Identification of thermal anomalies triggered by onboard software or by ground monitoring; Analysis of actual situation from available flight data; Correction implemented thanks to a complete set of commands and procedures; Check on the on-board configuration after correction uploading.
Technical Paper

Results of Breadboard Tests Withan Integrated CO2, Humidity and Thermal Control System

2003-07-07
2003-01-2348
Membrane gas absorption and desorption (MGA/MGD) for the removal of CO2 in manned spacecraft or other enclosed environment is subject of study by Stork and TNO for many years. The system is based on the combination of membrane separation and gas absorption. Advantage of this technology is that the system not only can be used to remove the carbon dioxide but also to control the relative humidity and temperature. Absorption of moisture and heat is achieved by cooling the absorption liquid below the dewpoint temperature of the gas stream. From the start in 1995, the Crew Transfer Vehicle is used as a basis for the design (1,2). Compared to the planned air conditioning system, consisting of a condensing heat exchanger, LiOH cartridges and a water evaporator assembly, MGA/MGD shows advantage in volume, mass and power consumption. The absorption liquid circulates through the spacecraft thermal control loop, replacing the coolant water.
X