Refine Your Search

Search Results

Viewing 1 to 2 of 2
Journal Article

Decision-Making for Autonomous Mobility Using Remotely Sensed Terrain Parameters in Off-Road Environments

2021-04-06
2021-01-0233
Off-road vehicle operation requires constant decision-making under great uncertainty. Such decisions are multi-faceted and range from acquisition decisions to operational decisions. A major input to these decisions is terrain information in the form of soil properties. This information needs to be propagated to path planning algorithms that augment them with other inputs such as visual terrain assessment and other sensors. In this sequence of steps, many resources are needed, and it is not often clear how best to utilize them. We present an integrated approach where a mission’s overall performance is measured using a multiattribute utility function. This framework allows us to evaluate the value of acquiring terrain information and then its use in path planning. The computational effort of optimizing the vehicle path is also considered and optimized. We present our approach using the data acquired from the Keweenaw Research Center terrains and present some results.
Journal Article

Balancing Lifecycle Sustainment Cost with Value of Information during Design Phase

2020-04-14
2020-01-0176
The complete lifecycle of complex systems, such as ground vehicles, consists of multiple phases including design, manufacturing, operation and sustainment (O&S) and finally disposal. For many systems, the majority of the lifecycle costs are incurred during the operation and sustainment phase, specifically in the form of uncertain maintenance costs. Testing and analysis during the design phase, including reliability and supportability analysis, can have a major influence on costs during the O&S phase. However, the cost of the analysis itself must be reconciled with the expected benefits of the reduction in uncertainty. In this paper, we quantify the value of performing the tests and analyses in the design phase by treating it as imperfect information obtained to better estimate uncertain maintenance costs.
X