Refine Your Search

Search Results

Viewing 1 to 5 of 5
Technical Paper

Temperature Control Analysis for the U.S. Lab, Node 1, and Elements Attached to Node 1

1997-07-14
972564
The International Space Station (ISS) Temperature and Humidity Control (THC) system has been designed with the intent of supplying the air cooling needs of various elements from the U.S. Lab heat exchanger assembly. Elements without independent air cooling capability are known as “parasitic” elements; these are Node 1, the Cupola, and the Mini Pressurized Logistics Module (MPLM). Analysis results are presented which show expected temperatures in the MPLM, and Node 1, as various heat loads are present in the respective elements. Analyses within this paper are coordinated with the results obtained from the Development Test of the complex USL/Node 1 integrated ducting system. This test was conducted in the summer of 1995, at the McDonnell Douglas test facility in Huntington Beach, California.
Technical Paper

Space Station THC/IMV Development Test/Analysis Correlations and Flight Predictions

1997-07-14
972565
The International Space Station (ISS) Temperature and Humidity Control/Intermodule Ventilation (THC/IMV) system for the U.S. Lab provides required cooling air for the U.S. Lab and also provides “parasitic” cooling air for Node 1 and its attached elements. This scheme provides cooled air from the Lab THC directly to Node 1 and also to elements attached to Node 1, at different stages of Space Station assembly. A development test of the U.S. Lab and Node 1/attached elements' integrated THC/IMV ducting system was performed in the summer of 1995. This test included the U.S. Lab's development level Common Cabin Air Assembly (CCAA), which removes sensible and latent heat from the circulated and ducted cabin air. A referenced 1996 ICES Paper contains the initial correlation results. An analytical model has been developed, which has been used to predict flow and pressure drop performance of the system for several potential and actual changes from the Development Test configuration.
Technical Paper

Incipient Failure Detection - The Detection of Certain Contaminating Processes

1967-02-01
670633
Three separate and distinct electrolytic and one galvanic process were identified by visual inspection, metallographic, electron microprobe, and x-ray diffraction analysis in a clocked, flip-flop integrated circuit flat pack and/or the associated printed circuit test jig (two on flat pack and two on circuit board). These four processes were all found to be detectable by the use of noise measurements in microvolts per root cycle at 1000 Hz (cycles per second). The direct current applied for noise measurement to the integrated circuit devices was 100 micro-amperes, as compared to the 6-8 milliamperes required for normal operation. After initial experimentation, the devices were caused to fail in a laboratory ambient environment, followed by an acceleration of the rate of electrolytic reaction through the use of essentially 100 percent relative humidity, versus the upper specification limit of 80 to 98% relative humidity.
Technical Paper

High Altitude Performance of High Bypass Ratio Engines - an Airframe Manufacturer's Point of View

1969-02-01
690652
The traditional method of determining the net thrust of an engine in cruise is explained. It is shown to result in a satisfactory net thrust uncertainty for jet and low bypass ratio engines but to be unsuitable for high bypass ratio engines. A redefinition of net thrust results in a new thrust determination method, called continuity method, which yields acceptable levels of net thrust uncertainty. The new method no longer requires supporting tests in a simulated altitude facility. The question is raised whether in future programs the demonstration of guaranteed cruise performance of an engine should not be carried out in flight tests rather than in an altitude test facility.
Technical Paper

Electric 30,000 RPM Shave Spindle for C Frame Riveter and High Performance Compact Aerospace Drill

2000-09-19
2000-01-3017
Two spindles are discussed in this paper. The first spindle was installed on nine C-frame riveters on the 737/757 wing line at the Boeing Renton facility. Due to discontinuing the use of Freon coolant and cutting fluid, the C-frame riveters had difficulty shaving 2034 ice box rivets with the existing 6000 RPM hydraulic spindles. The solution was to install electric 30,000 RPM shave spindles inside the existing 76.2 mm (3 in.) diameter hydraulic cylinder envelope. The new spindle is capable of 4 Nm (35 in. lbs.) of torque at full speed and 110 kgf (250 lbs.) of thrust. Another design of interest is the Electroimpact Model 09 spindle which is used for 20,000 RPM drilling and shaving on wing riveting systems. The Model 09 spindle is a complete servo-servo drilling system all mounted on a common baseplate. The entire spindle and feed assembly is only 6.5″ wide.
X