Refine Your Search

Search Results

Viewing 1 to 4 of 4
Journal Article

Flex Track One Sided One Up Assembly

2014-09-16
2014-01-2274
The Boeing Company is striving to improve quality and reduce defects and injuries through the implementation of lightweight “Right Sized” automated drill and fasten equipment. This has lead to the factory adopting Boeing developed and supplier built flex track drill and countersink machines for drilling fuselage circumferential joins, wing panel to spar and wing splice stringers. The natural evolution of this technology is the addition of fastener installation to enable One Up Assembly. The critical component of One Up Assembly is keeping the joint squeezed tightly together to prevent burrs and debris at the interface. Traditionally this is done by two-sided machines providing concentric clamp up around the hole while it is being drilled. It was proposed that for stiff structure, the joint could be held together by beginning adjacent to a tack fastener, and assemble the joint sequentially using the adjacent hole clamp up from the previous hole to keep the joint clamped up.
Technical Paper

Automated Floor Drilling Equipment for the Next Generation 737

1997-09-30
972809
Boeing needed a process to replace hand drilling for floor panel holes and galley and lavatory mounting locator holes in the floor grid of the completed 737 fuselage. Electroimpact developed a process, and the 737 AFDE machine, that is a substantial improvement over existing technology. It provides full CNC control, quick reconfiguration of hole patterns, fast drilling of up to 3000 holes in one 8-hour shift, drills both titanium and aluminum and works inside the fuselage.
Technical Paper

Turret Head Fastening Machine

1995-09-01
952174
The Turret Head Fastening System is an enhancement of current three position “C-frame” wing riveting machines. It was designed and built by Boeing as a fully instrumented research machine in 1991 for the 777 Airplane, and as a potential retrofit package for conventional drill, rivet, shave wing assembly machines. It was designed to automatically install rivets and bolts and perform the required hole preparation prior to fastener installation. In its current form, it will clamp a panel; and then as the fastener requires, drill, coldwork, ream, countersink the hole; inspect the hole; apply sealant when required; install threaded fasteners or rivets; torque the nut, swage the collar or upset the rivet as required; shave the rivet to ensure flushness; and finally unclamp the part - all within the current working envelope of a drill, rivet shave machine. Currently, switching from rivets to bolts requires a 5 minute tool change.
Technical Paper

A Phased Approach to Optimized Robotic Assembly for the 777X

2019-03-19
2019-01-1375
Low rate initial production of the 777X flight control surfaces and wing edges has been underway at the Boeing St. Louis site since early 2017. Drilling, inspection, and temporary fastening tasks are performed by automated multi-function robotic systems supplied by Electroimpact. On the heels of the successful implementation of the initial four (4) systems, Phases II and III are underway to meet increasing production demands with three (3) and four (4) new cells coming online, respectively. Assemblies are dedicated to particular cells for higher-rate production, while all systems are designed for commonality offering strategic backup capability. Safe operation and equipment density are optimized through the use of electronic safeguards. New time-saving process capabilities allow for one-up drilling, hole inspection, fastening, fastener inspection, and stem shaving.
X