Refine Your Search

Search Results

Viewing 1 to 5 of 5
Technical Paper

U.S. Military and Federal Government Cancellation of Part, Material, and Process Standards and Specifications

1997-06-03
972202
The Department of Defense has made progress in modernizing its procurement of weapon systems. Modernization has identified a need to address Federal and military standards and specifications for parts, materials, and processes that represent many de facto national standards. The aerospace industry is proposing a transition to commercial specifications that meet the needs of Acquisition Reform. This paper reviews the history and benefits of modernization and describes the transition process.
Technical Paper

Assembly of Interior Composite Panels Utilizing Bonded Interlocking Joints

1997-06-03
972233
Most commercial aircraft interior panels are constructed of honeycomb cored composite sandwich panels. The panels are conventionally joined using metal brackets fastened with screws. Over the past decade, most major interior fabricators have been in transition to a method of joinery using bonded interlocking joints. This method has recently been adopted by Boeing, and is known here as Tab and Slot Joinery. These interlocking joints are defined and illustrated. The history of the development effort is outlined. Design considerations are developed. Test programs are described, including a designed experiment and a special case fatigue test. Advantages of this new joinery method over the conventional are shown.
Technical Paper

Continuing Airworthiness Challenges

1994-03-01
940047
Structural safety is an evolutionary accomplishment, and attention to detail design features is key to its achievement. A multitude of design considerations is involved in ensuring the structural integrity of Boeing jet transports that have common design concepts validated by extensive analyses, tests, and three decades of service. The active service life of commercial airplanes has increased in recent years as a result of increasing costs for fleet replacements. As airplanes approach their design service objectives, the incidences of fatigue and corrosion may become widespread. Continuing airworthiness of the aging jet fleet requires diligent performance from the manufacturer, the airlines, and airworthiness authorities. This paper gives an overview of traditional Boeing maintenance-related activities, joint industry/airworthiness authority initiatives, and the anticipated benefits for future generations of commercial airplanes.
Technical Paper

Aluminum-Lithium (Alloy 2090) Fastening Evaluation for Commercial Aircraft Applications

1994-10-01
941844
During design of the 777 Airplane, light gage, near net section 2090-T86 extrusions were considered to reduce aircraft weight. The need to evaluate effects of fastener installation on 2090-T86 was indicated by a previous study documenting problems due to low short transverse tensile strength. Tests by Boeing installing fasteners into holes using interference fits showed 2090-T86 was more susceptible to damage from fastening than previously reported. Damage consisted of cracks normal to the short transverse direction around the periphery of the fastener hole. This report documents the test program conducted at Boeing.
Technical Paper

Certification of Automatic Hydraulic-Squeeze Fastening Equipment

1999-10-06
1999-01-3440
With the increasing shift toward automation with respect to fastener installation, the need has evolved for clearer definition of the process capability of new fastener installation automation systems. In light of Engineering design requirements, and to address the process capability issue, Boeing has developed and implemented D6- 56617, a machine certification process for automated fastening of fuselage structure. This philosophy was a new approach in the following ways: 1. Previously, engineering oversight of automated fastening systems was limited to wing structure applications. 2. The process requires that process capabilities and performance of the automated machinery itself be established by test. 3. The process requires that detailed Process Control Documents be developed and followed. 4. The process links the statistical test data to the day to-day operating parameters of the machine.
X