Refine Your Search

Search Results

Viewing 1 to 5 of 5
Journal Article

Improving AFP Cell Performance

2014-09-16
2014-01-2272
The Automated Fiber Placement (AFP) machine layup run time in large scale AFP layup cells consumes approximately 30% of the entire part build time. Consequentially, further reductions to the run time of the AFP machine part programs result in small improvements to the overall cycle time. This document discusses how Electroimpact's integrated system and cell design reduces the overall cycle time by reducing the time spent on non-machine processes.
Technical Paper

Medium Wave Infrared Heater for High-Speed Fiber Placement

2007-09-17
2007-01-3842
Electroimpact, in cooperation with a large airframe manufacturer, has developed Automated Fiber Placement equipment capable of depositing material at speeds in excess of 2000 inches per minute. As the machine lays down each new ply of material, the area forward to machine motion is heated just in advance of pressing the tape against the substrate. A fast-reacting, high-power infrared emitter heats this area quickly and safely. The design of these heaters is the subject of this paper.
Technical Paper

Offset Fastening Flex Track

2012-09-10
2012-01-1850
Flex Track Drilling systems have been successfully implemented into several production environments and scenarios over the past couple of years. They continue to see a high demand where traditional machine tool implementations might be prohibitive due to cost or existing jig structures. This demand for innovation has led to a unique Flex Track design termed an Offset Flex Track that not only works between the vacuum rails, but can work beyond the envelope of the rails. This allows the machine to be used in situations such as the leading edge of wings where the vacuum rails cannot straddle the work envelope. The next evolution of this Offset machine is the introduction of final fastener installation onto the head using an onboard rivet gun. In addition, the camera used to locate datum points on the fuselage is now integrated into the nose piece, eliminating the need for a tool change to a spindle mounted camera.
Technical Paper

Low Voltage Electromagnetic Lockbolt Installation

1992-10-01
922406
British Aerospace, Airbus Ltd., Chester, UK manufactures the main wing box assembly for all current Airbus programs. Titanium interference fasteners are used in large numbers throughout these aircraft structures. On the lower wing skin of the A320 alone there are approximately 11,000 of this fastener type. Currently, the majority of these fasteners are manually installed using pneumatic or hydraulic tooling. British Aerospace engineers recognized the significant potential which automation offers to reduce these current labor intensive installation methods. Electroimpact proposed extending Low Voltage Electromagnetic Riveter (LVER) technology to the automatic installation of these interference fasteners as well as rivets. Close liaison between Airbus and Electroimpact engineers resulted in the development of an automated LVER based lockbolt installation system, which is currently undergoing evaluation.
Technical Paper

Modernization of Equipment in Aerospace Nondestructive Inspection

2023-03-07
2023-01-1007
Equipment used in aerospace non-destructive inspection presents opportunity for modernization. Many inspection cells in production operate using a widely available control system software that is suitable for most inspection applications with minimal customization. The size and complex geometry of airframe components demand more application-specific system design to ensure the reliability and cycle time required for an aerospace production schedule. Ordinary inspection systems require manual teaching for program generation and lack datum-finding systems required to rerun programs without modification. Integration of offline programming software and machine vision instruments can save inspection technicians hours or shifts per part by eliminating the need for program retraining due to variation in part delivery position. Modernized inspection cells will reduce labor burden on technicians and provide reliable cycle time information to production planners.
X