Refine Your Search

Search Results

Viewing 1 to 3 of 3
Technical Paper

Early Results of an Integrated Water Recovery System Test

2001-07-09
2001-01-2210
The work presented in this paper summarizes the early results of an integrated advanced water recovery system test conducted by the Crew and Thermal Systems Division (CTSD) at NASA-Johnson Space Center (JSC). The system design and the results of the first two months of operation are presented. The overall objective of this test is to demonstrate the capability of an integrated advanced water recovery system to produce potable quality water for at least six months. Each subsystem is designed for operation in microgravity. The primary treatment system consists of a biological system for organic carbon and ammonia removal. Dissolved solids are removed by reverse osmosis and air evaporation systems. Finally, ion exchange technology in combination with photolysis or photocatalysis is used for polishing of the effluent water stream. The wastewater stream consists of urine and urine flush water, hygiene wastewater and a simulated humidity condensate.
Technical Paper

Analyses of the Integration of Carbon Dioxide Removal Assembly, Compressor, Accumulator and Sabatier Carbon Dioxide Reduction Assembly

2004-07-19
2004-01-2496
An analysis model has been developed for analyzing/optimizing the integration of a carbon dioxide removal assembly (CDRA), CO2 compressor, accumulator, and Sabatier CO2 reduction assembly. The integrated model can be used in optimizing compressor sizes, compressor operation logic, water generation from Sabatier, utilization of CO2 from crew metabolic output, and utilization of H2 from oxygen generation assembly. Tests to validate CO2 desorption, recovery, and compression had been conducted in 2002-2003 using CDRA/Simulation compressor set-up at NASA Marshall Space Flight Center (MSFC). An analysis of test data has validated CO2 desorption rate profile, CO2 compressor performance, CO2 recovery and CO2 vacuum vent in the CDRA model. Analysis / optimization of the compressor size and the compressor operation logic for an integrated closed air revitalization system is currently being conducted
Technical Paper

Mir Leak Detection Using Fluorescent Tracer Gases

1999-07-12
1999-01-1938
On June 25, 1997 a docking mishap of a Progress supply ship caused the Progress vehicle to crash into an array of solar panels and puncture the hull of the Spektr module. The puncture was small enough to allow the crew to seal off the Spektr module and repressurize the rest of the station. The Progress vehicle struck the Spektr module several times and the exact location, size, and number of punctures in the Spektr hull was unknown. Russian cosmonauts donned space suits and went inside the Spektr module to repair some electrical power cables and look for the location of the hull breach, they could not identify the exact location of the hole (or holes). The Spektr module was pressurized with Mir cabin air twice during the STS-86 fly around in an attempt to detect leakage (in the form of ice particles) from the module. Seven particles were observed within a 36 second time span, but tracking the path of the individual particles did not pinpoint a specific leak location.
X