Refine Your Search

Search Results

Viewing 1 to 3 of 3
Technical Paper

Requirements Development, Management and Architecture for Military Ground Vehicle Systems

2010-04-12
2010-01-0491
Systems engineering is a key discipline to develop, deploy, and sustain military systems. The wide variety of product types and the tendency to leverage emerging technologies require that disciplined technical planning and management processes be used by both engineers and program managers in all phases of a product's life cycle. This paper describes requirements development, management, and architecture in military systems engineering and acquisition be it software or hardware.
Journal Article

Flexible Design and Operation of a Smart Charging Microgrid

2014-04-01
2014-01-0716
The reliability theory of repairable systems is vastly different from that of non-repairable systems. The authors have recently proposed a ‘decision-based’ framework to design and maintain repairable systems for optimal performance and reliability using a set of metrics such as minimum failure free period, number of failures in planning horizon (lifecycle), and cost. The optimal solution includes the initial design, the system maintenance throughout the planning horizon, and the protocol to operate the system. In this work, we extend this idea by incorporating flexibility and demonstrate our approach using a smart charging electric microgrid architecture. The flexibility is realized by allowing the architecture to change with time. Our approach “learns” the working characteristics of the microgrid. We use actual load and supply data over a short time to quantify the load and supply random processes and also establish the correlation between them.
Technical Paper

Advantages of Simulation Based Reliability Growth Planning

2015-04-14
2015-01-0439
The current reliability growth planning model used by the US Army, the Planning Model for Projection Methodology (PM2), is insufficient for the needs of the Army. This paper will detail the limitations of PM2 that cause Army programs to develop reliability growth plans that incorporate unrealistic assumptions and often demand that infeasible levels of reliability be achieved. In addition to this, another reliability growth planning model being developed to address some of these limitations, the Bayesian Continuous Planning Model (BCPM), will be discussed along with its own limitations. This paper will also cover a third reliability growth planning model that is being developed which incorporates the advantageous features of PM2 and BCPM but replaces the unrealistic assumptions with more realistic and customizable ones.
X