Technical Paper
The Initial Tests for Performance Evaluation of Closed Plant Experiment Facility (CPEF) of Closed Ecology Experiment Facilities (CEEF)
1997-07-01
972517
The Closed Ecology Experiment Facilities (CEEF) have been under construction in northern Japan since 1994. These facilities contain the Closed Plant Experiment Facility (CPEF), as well as other facilities, in all of which, Controlled Ecological Life Support Systems (CELSS) research and development can be conducted. The CPEF includes two Plant Cultivation Modules (PCMs), which contain a PCM consists of three 30m2 closed cultivation rooms illuminated solely by lamps and a 165.1m3 preparation room, and a PCM consists of a 60m2 closed cultivation room illuminated by natural light and supplemental lamps and a 88.8m3 preparation room, and a Material Circulation System (MCS). Measured rate of air exchange between a 30m2 cultivation room and the preparation room was 0.48% hour-1, and that for a 60m2 cultivation room was about 0.11% hour-1. Air leak rate of the PCM as a whole was less than 0.01% hour-1 under isothermal and equal pressure condition.