Refine Your Search

Topic

Search Results

Standard

Variation Management of Key Characteristics

2001-10-01
HISTORICAL
AS9103
This Standard is primarily intended to apply to new parts, but can also be applied to parts currently in production. The Standard shall be applicable to all production processes that influence the variation of Key Characteristics.
Standard

Supply Chain Risk Management Guideline

2014-02-06
CURRENT
ARP9134A
Supply Chain Risk Management (SCRM), defined in this guideline, can be applied proactively for the protection of all procured products and services; both flying and non-flying through all levels of the supply chain. The guideline focuses on Quality as a key risk assessment factor taking into account elements from all aspects of the business having a direct link to global quality management. This concept/model is shown in Figure 1. While traditional “small q” Quality is a key element to be assessed, from a company business point of view, other elements play an important part in minimizing risk. This guideline defines such risk factors for consideration. SCRM as a business protection tool will be most effective when used to identify, and reduce risks when generating new business with new and existing suppliers. However, the tools and techniques described hereafter can also be applied to evaluate the existing supply chain network and determine the level of control required.
Standard

Supply Chain Risk Management Guideline

2004-03-03
HISTORICAL
ARP9134
Supply Chain Risk Management (SCRM), defined in this guideline, can be applied proactively for the protection of all procured products and services; both flying and non-flying through all levels of the supply chain. The guideline focuses on Quality as a key risk assessment factor taking into account elements from all aspects of the business having a direct link to global quality management. This concept/model is shown in Figure 1. While traditional "small q" Quality is a key element to be assessed, from a company business point of view, other elements play an important part in minimizing risk. This guideline defines such risk factors for consideration. SCRM as a business protection tool will be most effective when used to identify, and reduce risks when generating new business with new and existing suppliers. However, the tools and techniques described hereafter can also be applied to evaluate the existing supply chain network and determine the level of control required.
Standard

Supplier Self Verification Process Delegation Programs

2007-09-26
HISTORICAL
AS9015
This SAE Aerospace Standard (AS) further defines the requirements for a delegation process identified in Aerospace Quality Management System (AQMS) standards (i.e., AS9100, AS9110, AS9120). This standard establishes minimum requirements for the delegation of product verification to an organization’s suppliers; outlining requirements for the initial delegation (qualification/selection), maintenance, and removal/withdrawal of delegations.
Standard

Statistical Product Acceptance Requirements Using Isolated Lot Sampling Methods

2005-10-27
HISTORICAL
ARP9013/1
The purpose of this SAE Aerospace Recommended Practice (ARP) is to ensure conformance for each product characteristic being verified in a lot, without maintaining information from previous lots. ARP9013/1 specifies a product acceptance system for isolated lots. For example, isolated lot sampling avoids keeping track of the normal, tightened, and reduced levels of sampling formerly used in MIL-STD-105 and currently used in ANSI/ASQC Z1.4. Because those switching rules provided significant long-term protection for product quality, these isolated lot tables replace that protection in other ways.
Standard

Statistical Product Acceptance Requirements Using Attribute or Variable Lot Acceptance Sampling Plans

2005-10-27
HISTORICAL
ARP9013/2
The purpose of ARP9013/2 is to ensure conformance for each product characteristic being verified in each lot in the series. ARP9013/2 document specifies a product acceptance system using either attribute or variable lot acceptance methods documented in ANSI/ASQC Z1.4, ANSI/ASQC Z1.9, and “Zero Acceptance Number Sampling Plans” by Nicholas L. Squeglia.
Standard

Requirements for Aerospace Auditor Competency and Training Courses

2007-03-29
HISTORICAL
AS9104/3
This document provides the minimum requirements (Body of Knowledge) for AQMS auditors who will participate in AQMS certification/registration activities, including the auditor authentication process and requirements for a training organization. It is applicable to auditors seeking formal approval to conduct audits of the AQMS in support of the IAQG, and those who manage the competency element of an AQMS audit program and/or training organizations.
Standard

Quality Systems Non-Conformance Documentation

2001-12-21
HISTORICAL
AS9131
This document defines to supplier/subcontractor common information and documentation required to inform Customers, when applicable about nonconformity (Customer-provider use). It does not apply to the reporting of a nonconformity to the product owner/operator. Reporting of Product Quality Escapes and use of Waiver/Concession is subject to the terms and conditions of the contractual requirements.
Standard

Quality Management Systems - Nonconformance Documentation

2007-09-26
HISTORICAL
AS9131A
This standard defines the common nonconformance data definition and documentation that an internal or external supplier or sub-tier supplier must submit when informing a customer of a nonconformity. The requirements shall be are applicable for reporting a nonconforming product to the owner/operator (i.e., end item user), if specified by contract. Reporting of nonconformance data, either electronically or conventionally on paper, is subject to the terms and conditions of the contract. This also includes, where applicable, data access under export control regulations.
Standard

Quality Management Systems - Nonconformance Documentation

2009-04-16
HISTORICAL
AS9131B
This standard defines the common nonconformance data definition and documentation that an internal or external supplier or sub-tier supplier must submit when informing a customer of a nonconformity. The requirements shall be are applicable for reporting a nonconforming product to the owner/operator (i.e., end item user), if specified by contract. Reporting of nonconformance data, either electronically or conventionally on paper, is subject to the terms and conditions of the contract. This also includes, where applicable, data access under export control regulations.
Standard

Qualification Procedure for Aerospace Standard Parts

2002-07-16
HISTORICAL
AS9133
This document provides a basic uniform method for ensuring that aerospace standard parts (products) conform with the requirements of technical specifications referring to qualified parts and for a manufacturer of such parts to have a qualified management system at least equivalent to AS/EN/SJAC9100. These standards apply when called out in the aerospace standard part standard.
Standard

Inspection and Test Quality System

2001-10-01
HISTORICAL
AS9003
This document contains the minimum requirements for supplier Inspection and Test Quality System. It is emphasized that the quality system requirements specified in this standard are complementary (not alternative) to the contractual and applicable law and regulatory requirements.
Standard

Foreign Object Damage (FOD) Prevention Program - Requirements for Aviation, Space, and Defense Organizations

2022-09-08
CURRENT
AS9146
This standard defines FOD Prevention Program requirements for organizations that design, develop, and provide aviation, space, and defense products and services; and by organizations providing post-delivery support, including the provision of maintenance, spare parts, or materials for their own products and services. It is emphasized that the requirements specified in this standard are complementary (not alternative) to customer, and applicable statutory and regulatory requirements. Should there be a conflict between the requirements of this standard and applicable statutory or regulatory requirements, the latter shall take precedence.
X