Refine Your Search

Topic

Author

Search Results

Technical Paper

777X Control Surface Assembly Using Advanced Robotic Automation

2017-09-19
2017-01-2092
Fabrication and assembly of the majority of control surfaces for Boeing’s 777X airplane is completed at the Boeing Defense, Space and Security (BDS) site in St. Louis, Missouri. The former 777 airplane has been revamped to compete with affordability goals and contentious markets requiring cost-effective production technologies with high maturity and reliability. With tens of thousands of fasteners per shipset, the tasks of drilling, countersinking, hole inspection, and temporary fastener installation are automated. Additionally and wherever possible, blueprint fasteners are automatically installed. Initial production is supported by four (4) Electroimpact robotic systems embedded into a pulse-line production system requiring strategic processing and safeguarding solutions to manage several key layout, build and product flow constraints.
Technical Paper

A Selected Operational History of the Internal Thermal Control System (ITCS) for International Space Station (ISS)

2004-07-19
2004-01-2470
The Internal Thermal Control System (ITCS) has been developed jointly by Boeing Corporation, Huntsville, Alabama and Honeywell Engines & Systems, Torrance, California to meet the internal thermal control needs for the International Space Station (ISS). The ITCS provides heat removal for the critical life support systems and thermal conditioning for numerous experiment racks. The ITCS will be fitted on a number of modules on the ISS. The first US Element containing the ITCS, Node 1, was launched in December 1998. Since Node 1 does not contain a pump to circulate the fluid it was not filled with ITCS fluid until after the US Laboratory Module was installed. The second US Element module, US Laboratory Module, which contains the pumps and all the major ITCS control hardware, was launched in February 2001. The third US Element containing the ITCS, the US Airlock, was launched in July 2001.
Technical Paper

AFP Automated Inspection System Performance and Expectations

2017-09-19
2017-01-2150
In AFP manufacturing systems, manually inspection of parts consumes a large portion of total production time and is susceptible to missing defects. The aerospace industry is responding to this inefficiency by focusing on the development of automated inspection systems. The first generation of automated inspection systems is now entering production. This paper reviews the performance of the first generation system and discusses reasonable expectations. Estimates of automated inspection time will be made, and it will be shown that the automated solution enables a detailed statistical analysis of manufactured part quality and provides the data necessary for statistical process control. Data collection allows for a reduction in rework because not all errors need to be corrected. Expectations will be set for the accuracy for both ply boundary and overlap/gap measurements. The time and resource cost of development and integration will also be discussed.
Technical Paper

Advanced Vehicle Wire Health for the 21st Century

2004-11-02
2004-01-3159
Traditionally, vehicle power wiring safety has consisted of a reactive thermal circuit breaker that responds to an overload condition. In addition, maintenance operations have been reactive as well, searching for a possible damaged section of wiring in a large and often difficult to access wire bundle. Advancements in detection of changes in impedance, arc, corona, and reflectometry to measure general wire damage have the potential to automate the process, while increasing vehicle safety and reducing costs. Some of these technologies are also pro-active and can warn of a potential problem during routine maintenance checks using hand held instrumentation or if embedded in a vehicle can detect problems prior to power up or after system power up using real-time monitoring.
Technical Paper

Aircraft Electric Brakes - Technical Development

2002-11-05
2002-01-2946
The design, development and testing of electric brakes for the DARPA/USAF/Boeing X-45A Unmanned Combat Air Vehicle (UCAV) demonstrator is discussed. The UCAV effort presented a new set of challenges and capability requirements for the brake system. A selection of electric brake technical development results is presented.
Technical Paper

An Automated Production Fastening System for LGP and Hi-Lok Titanium Bolts for the Boeing 737 Wing Panel Assembly Line

2015-09-15
2015-01-2514
A new automated production system for installation of Lightweight Groove Proportioned (LGP) and Hi-Lock bolts in wing panels has been implemented in the Boeing 737 wing manufacturing facility in Renton, Washington. The system inserts LGP and Hi-Lok bolts into interference holes using a ball screw mechanical squeeze process supported by a back side rod-locked pneumatic clamp cylinder. Collars are fed and loaded onto a swage die retaining pin, and swaging is performed through ball screw mechanical squeeze. Offset and straight collar tools allow the machine to access 99.9% of fasteners in 3/16″, ¼″ and 5/16″ diameters. Collar stripping forces are resolved using a dynamic ram inertial technique that reduces the pull on the work piece. Titanium TN nuts are fed and loaded into a socket with a retaining spring, and installed on Hi-Loks Hi-Lok with a Bosch right angle nut runner.
Journal Article

Application of Synthetic Jets to Enhance the Performance of a Vertical Tail

2013-09-17
2013-01-2284
The performance enhancement of a vertical tail provided by aerodynamic flow control could allow for the size of the tail to be reduced while maintaining similar control authority. Decreasing tail size would create a reduction in weight, drag, and fuel costs of the airplane. The application of synthetic jet actuators on improving the performance of the vertical tail was investigated by conducting experiments on 1/9th and 1/19th scale wind tunnel models (relative to a Boeing 767 tail) at Reynolds numbers of 700,000 and 350,000, respectively. Finite-span synthetic jets were placed slightly upstream of the rudder hinge-line in an attempt to reduce or even eliminate the flow separation that commences over the rudder when it was deflected to high angles. Global force measurements on the 1/9th scale model showed that the flow control is capable of increasing side force by a maximum of 0.11 (19%). The momentum coefficient that created this change was relatively small (Cμ = 0.124%).
Journal Article

Augmented Reality and Other Visualization Technologies for Manufacturing in Boeing

2011-10-18
2011-01-2656
The Efficient Assembly, Integration & Test (EAIT) team at Boeing Research & Technology, Boeing's central technology organization, is working on multiple implementations of Augmented Reality to aid assembly at the satellite production facility in El Segundo, CA. This presentation will discuss our work to bring an Augmented Reality tool to the shop floor, integrating product design and manufacturing techniques into a synergistic backbone and how this approach can support the delivery of engineering design intent on the shop floor. The team is developing a system to bring designer's 3D CAD models to the technicians on the shop floor, and spatially register them to live camera views of production hardware. We will discuss our work in evaluating multiple motion captures systems, how we integrated a Vicon system with Augmented Reality software, and our development of a user interface allowing technicians to manipulate the graphical display.
Journal Article

Automatic Bolt Feeding on a Multifunction Flextrack

2011-10-18
2011-01-2773
One of the largest advancements in the use of the Flextrack technology is the addition of automated fastener installation on the Multifunction Flextrack made by Electroimpact. The new Flextrack installs SSTF (Single Sided Temporary Fasteners) into the holes it drills without removing clamp-up force from the workpiece. This is the first Flextrack to drill and install fasteners and its functionality goes beyond even these functions. The fasteners, SSTF bolts, are increasingly replacing more cumbersome and manual tools for temporary fastening of aerospace components during assembly. They provide doweling, clamp-up, and feature a compact head to facilitate machine installation. The new Multifunction Flextrack carries the bolts on the machine head as opposed to being fed through a feed tube. A Bolt Cartridge System carries up to 80 bolts onboard the Flextrack and the Cartridges can be quick changed for use with several different diameters.
Technical Paper

Automatic Tool Change System for Stringer Side Rivet and Bolt Anvils on a D-Frame or C-Frame Fuselage Fastening Machine

2017-09-19
2017-01-2080
Manually changing stringer-side tooling on an automatic fastening machine is time consuming and can be susceptible to human error. Stringer-side tools can also be physically difficult to manage because of their weight, negatively impacting the experience and safety of the machine operator. A solution to these problems has recently been developed by Electroimpact for use with its new Fuselage Skin Splice Fastening Machine. The Automatic Tool Changer makes use of a mechanically passive gripper system capable of securely holding and maneuvering twelve tools weighing 40 pounds each inside of a space-saving enclosure. The Automatic Tool Changer is mounted directly to the stringer side fastening head, meaning the machine is capable of changing tools relatively quickly while maintaining its position on the aircraft panel with no machine operator involvement.
Technical Paper

Automating AFP Tuning Using a Laser Sensor

2011-10-18
2011-01-2593
Electroimpact Automatic Fiber Placement (AFP) machines lay-up composite parts by accurately placing carbon fiber tow (strips of impregnated carbon fiber) on a mold. In order to achieve high accuracy at high speeds, the processes of feeding and cutting tows must be tuned. Historically, the tuning has been a time-consuming, manual process. This paper will present a methodology to replace manual measurements with an automated laser, improve measurement speed by an order of magnitude, improve accuracy from +/- 0.020\mi (manual) to +/- 0.015\mi (laser), and eliminate human error.
Journal Article

Body Join Drilling for One-Up-Assembly

2013-09-17
2013-01-2296
Over 1,200 large diameter holes must be drilled into the side-of-body join on a Boeing commercial aircraft's fuselage. The material stack-ups are multiple layers of primarily titanium and CFRP. Due to assembly constraints, the holes must be drilled for one-up-assembly (no disassembly for deburr). In order to improve productivity, reduce manual drilling processes and improve first-time hole quality, Boeing set out to automate the drilling process in their Side-of-Body join cell. Implementing an automated solution into existing assembly lines was complicated by the location of the target area, which is over 15 feet (4 meters) above the factory floor. The Side-of-Body Drilling machines (Figure 1) are capable of locating, drilling, measuring and fastening holes with less than 14 seconds devoted to non-drilling operations. Drilling capabilities provided for holes up to ¾″ in diameter through stacks over 4.5″ thick in a titanium/CFRP environment.
Technical Paper

Boeing Crew Exploration Vehicle Environmental Control & Life Support System Architecture Overview

2007-07-09
2007-01-3043
The Boeing Company under the teaming agreement with the Northrop Grumman Systems Corporation and in compliance with the NASA Phase 1 contract had the responsibilities for the CEV architecture development of the Environmental Control and Life Support (ECLS) system under the NASA Phase 1 contract. The ECLS system was comprised of the various subsystems which provided for a shirt-sleeve habitable environment for crew to live and work in the crew module of the CEV. This architecture met the NASA requirements to ferry cargo and crew to ISS, and Lunar sortie missions, with extensibility to long duration missions to Moon and Mars. This paper provides a summary overview of the CEV ECLS subsystems which was proposed in compliance with the contract activities.
Technical Paper

Clarifying Objectives and Results of Equivalent System Mass Analyses for Advanced Life Support

2003-07-07
2003-01-2631
This paper discusses some of the analytical decisions that an investigator must make during the course of a life support system trade study. Equivalent System Mass (ESM) is often applied to evaluate trade study options in the Advanced Life Support (ALS) Program. ESM can be used to identify which of several options that meet all requirements are most likely to have lowest cost. It can also be used to identify which of the many interacting parts of a life support system have the greatest impact and sensitivity to assumptions. This paper summarizes recommendations made in the newly developed ALS ESM Guidelines Document and expands on some of the issues relating to trade studies that involve ESM.
Technical Paper

Clothing Systems for Long Duration Space Missions

2004-07-19
2004-01-2580
Clothing accounts for a surprisingly large quantity of resupply and waste on the International Space Station (ISS), of the order of 14% of the equivalent system mass (ESM). Efforts are underway in the ISS program to reduce this, but much greater changes are likely to be possible and justifiable for long duration missions beyond low Earth orbit (LEO). Two approaches are being assessed for long duration missions: to reduce the mass of the wardrobe through use of lighter fabrics, and to clean clothing on board for reuse. Through good design including use of modern fabrics, a lighter weight wardrobe is expected to be feasible. Collateral benefits should include greater user comfort and reduced lint generation. A wide variety of approaches to cleaning is possible. The initial evaluation was made based on a terrestrial water-based washer and dryer system, as this represents the greatest experience base.
Technical Paper

Comparison of Waste Systems

2004-07-19
2004-01-2581
A summary of waste processes and waste process data is presented in the context of mission equivalent system mass. Storage, size reduction, drying, aerobic and anaerobic biodegradation, chemical oxidation, pyrolysis, and post processing are evaluated in the context of probable long-duration missions beyond LEO, and the probable quantities and types of wastes and of the other on-board systems. An assessment of the waste systems described in the ALS Reference Missions Document is presented, and rationale for some changes to these systems is provided.
Technical Paper

Corrosion Testing of Brazed Space Station IATCS Materials

2004-07-19
2004-01-2471
Increased nickel concentrations in the IATCS coolant prompted a study of the corrosion rates of nickel-brazed heat exchangers in the system. The testing has shown that corrosion is occurring in a silicon-rich intermetallic phase in the braze filler of coldplates and heat exchangers as the result of a decrease in the coolant pH brought about by cabin carbon dioxide permeation through polymeric flexhoses. Similar corrosion is occurring in the EMU de-ionized water loop. Certain heat exchangers and coldplates have more silicon-rich phase because of their manufacturing method, and those units produce more nickel corrosion product. Silver biocide additions did not induce pitting corrosion at silver precipitate sites.
Technical Paper

Costs and Benefits of Bioreactors

2002-07-15
2002-01-2523
Different options have been examined for providing minerals to plants for bioregeneration. The baseline option is to ship the minerals. The equivalent system mass of two different bioreactor systems for recycling a portion of these minerals, a fixed-film bioreactor and a stirred-tank reactor are calculated. Either option could reduce the ESM for providing these minerals for a 15-year mission to Mars, with 50% food closure.
Technical Paper

Development of a Mobile Drilling and Fastening System Based on a PKM Robotic Platform

2015-09-15
2015-01-2509
The Boeing Company has developed a mobile robotic drilling and fastening system for use in assembly processes on the lower panel of a horizontally fixtured wing. The robotic system, referred to as Lower-panel Drilling and Fastening System (LPDFS), was initially developed as part of an initiative to minimize facilities costs by not requiring costly foundation work. It is designed to operate with a high level of autonomy, minimizing operator intervention, including that required for machine setup and tool changes. System design enables positioning the work piece at a lower ergonomic height for concurrent manual processes. In all aspects of design, the system will maintain maximum flexibility for accommodating future manufacturing changes and increases in production rate, while meeting the strict accuracy requirements characteristic of aircraft manufacturing.
Technical Paper

Drilling Mixed Stack Materials for the BOEING 787

2010-09-28
2010-01-1867
The new combinations such as composites and titanium that are being used on today's new airplanes are proving to be very challenging when drilling holes during manufacturing and assembly operations. Gone are the days of hand drilling with high speed steel drills through soft aluminum structure, after which aluminum rivets would be swaged into those holes with very generous tolerances. The drilling processes today need to use cutter materials hard enough and tough enough to cut through hard metals such as titanium, yet be sharp enough to resistant abrasion and maintain size when drilling through composites. There is a constant search for better cutters and drills that can drill a greater number of holes. The cost of materials used in today's aircraft is much higher. The cutting tools are more expensive and the hole tolerances are much tighter.
X