Refine Your Search

Search Results

Viewing 1 to 2 of 2
Technical Paper

AJ (Mg-Al-Sr) Alloy System Used for New Engine Block

2004-03-08
2004-01-0659
AJ alloy is used with a new Aluminum-Magnesium Composite Design, which is an innovative approach to lightweight crankcase technology. The component is manufactured using high pressure die cast process. A wide range of chemical compositions was used to develop a good understanding of the behavior of this alloy system (castability, thermophysical, mechanical, microstructure). The basic mechanical properties were determined from separately die cast samples and also from samples machined out from high pressure die cast components. Tensile, creep, bolt load retention/relaxation and high cycle fatigue properties were established and analyzed using multivariate analysis and statistical approach. This methodology was used to select the optimal chemical composition to match the requirements. The sensitivity of the alloy to heat exposure was investigated for both mechanical properties and microstructure.
Technical Paper

Light Weight Engine Construction through Extended and Sustainable Use of Mg-Alloys

2006-04-03
2006-01-0068
Eight partners from Europe and one from North America have joined efforts in a EU-supported project to find new ways for sustainable production of Mg-based engine blocks for cars. The ultimate aim of the work is to reduce vehicle weight, thereby reducing fuel consumption and CO2 emissions from operation of the vehicle. Four new magnesium alloys are considered in the project and an engine block has been series cast - 20 each in two alloys. An extensive mechanical testing program has been initiated to identify in particular the high temperature limits of the four alloys and a significant experimental study of proper bolt materials for joining is being done in parallel. Engine redesign and life cycle analysis has also been completed to secure the future sustainable exploitation of the project results. This paper presents an overview of the work and results obtained until now - 3 months before the ending date of the project.
X