Refine Your Search

Topic

Author

Affiliation

Search Results

Viewing 1 to 20 of 11194
Event

2024-04-28
Journal Article

1-g Suit Port Concept Evaluator 2008 Test Results

2009-07-12
2009-01-2572
The Lunar Electric Rover (LER), which was formerly called the Small Pressurized Rover (SPR), is currently being carried as an integral part of the lunar surface architectures that are under consideration in the Constellation Program. One element of the LER is the suit port, which is the means by which crew members perform Extravehicular Activities (EVAs). Two suit port deliverables were produced in fiscal year 2008: a 1-g suit port concept evaluator for functional integrated testing with the LER 1-g concept vehicle and a functional and pressurizable Engineering Unit (EU). This paper focuses on the 1-g suit port concept evaluator test results from the Desert Research and Technology Studies (D-RATS) October 2008 testing at Black Point Lava Flow (BPLF), Arizona. The 1-g suit port concept evaluator was integrated with the 1-g LER cabin and chassis concepts.
Standard

10 Megabit/sec Network Configuration Digital Time Division Command/Response Multiplex Data Bus

2013-04-29
HISTORICAL
AS5652
This SAE Aerospace Standard (AS) contains requirements for a digital time division command/response multiplex data bus, for use in systems integration that is functionally similar to MIL-STD-1553B with Notice 2 but with a star topology and some deleted functionality. Even with the use of this document, differences may exist between multiplex data buses in different system applications due to particular application requirements and the options allowed in this document. The system designer must recognize this fact and design the multiplex bus controller (BC) hardware and software to accommodate such differences. These designer selected options must exist to allow the necessary flexibility in the design of specific multiplex systems in order to provide for the control mechanism, architectural redundancy, degradation concept, and traffic patterns peculiar to the specific application requirements.
Standard

10 Megabit/sec Network Configuration Digital Time Division Command/Response Multiplex Data Bus

2018-01-18
CURRENT
AS5652A
This SAE Aerospace Standard (AS) contains requirements for a digital time division command/response multiplex data bus, for use in systems integration that is functionally similar to MIL-STD-1553B with Notice 2 but with a star topology and some deleted functionality. Even with the use of this document, differences may exist between multiplex data buses in different system applications due to particular application requirements and the options allowed in this document. The system designer must recognize this fact and design the multiplex bus controller (BC) hardware and software to accommodate such differences. These designer selected options must exist to allow the necessary flexibility in the design of specific multiplex systems in order to provide for the control mechanism, architectural redundancy, degradation concept, and traffic patterns peculiar to the specific application requirements.
Journal Article

11 Reasons to Use Automated Metrology

2019-03-19
2019-01-1369
Aerospace structures manufacturers find themselves frequently engaged in large-scale 3D metrology operations, conducting precision measurements over a volume expressed in meters or tens of meters. Such measurements are often done by metrologists or other measurement experts and may be done in a somewhat ad-hoc fashion, i.e., executed in the most appropriate method according to the lights of the individual conducting the measurement. This approach is certainly flexible but there are arguments for invoking a more rigorous process. Production processes, in particular, demand an automated process for all such “routine” measurements. Automated metrology offers a number of advantages including enabling data configuration management, de-skilling of operation, real time input data error checking, enforcement of standards, consistent process execution and automated data archiving. It also reduces training, setup time, data manipulation and analysis time and improves reporting.
Technical Paper

11 Rules of Design for Manufacturing when Producing Pre-Impregnated Carbon Fiber-Reinforced Plastic Components - an Application at SAAB Aerostructures

2016-09-27
2016-01-2124
Carbon fiber-reinforced plastic (CFRP) is one of the most commonly used materials in the aerospace industry today. CFRP in pre-impregnated form is an anisotropic material whose properties can be controlled to a high level by the designer. Sometimes, these properties make the material hard to predict with regards to how the geometry affects manufacturing aspects. This paper describes eleven design rules originating from different guidelines that describe geometrical design choices and deals with manufacturability problems that are connected to them, why they are connected and how they can be minimized or avoided. Examples of design choices dealt with in the rules include double curvature shapes, assembly of uncured CFRP components and access for non-destructive testing (NDT). To verify the technical content and ensure practicability, the rules were developed by, inter alia, studying literature and performing case studies at SAAB Aerostructures.
Standard

13-Conductor Electrical Cable between Towing Vehicle and Trailer

2022-06-15
WIP
J3284
This SAE standard establishes the minimum construction and performance requirements for a combination cable consisting of 9 conductors and 2 twisted pairs for use on trucks, trailers, and dollies. The cable includes power, ground and 2 jacketed/unshielded twisted paired signal circuits. This standard will be used in conjunction with the SAEJ XXXX “13 Conductor Electrical Connector (Plug and Receptacle) between Towing Vehicle and Trailer”. The standard will also include the test procedures, design and performance requirements for the cable.
Technical Paper

135 Days in Isolation and Confinement: The Hubes Simulation

1995-07-01
951512
The EUROMIR-95 flight was selected as model for the HUBES experiment: a similar duration (135 days), a similar crew (3 men), similar schedule organisation (8 hours work, 8 hours sleep, 8 hours off-duties), similar workload for the crew and the mission control (performance of scientific experiments), similar setup for communication and data processing, and similar layout of the MIR station, as the simulation was performed in the MIR simulator located at the Institute for BioMedical Problems (IBMP) in Moscow. The Scientific Programme of HUBES had been elaborated by integration of 31 experiments from more than 80 research proposals from Principal Investigators from Europe, USA and Russia, in domains of Physiology, Psychology, Operations and Technology.
Technical Paper

1553 RT Mechanizations for Data Sample Consistency and Multi-Message Transfers

1993-04-01
931600
System requirements and Interface Control Drawings (ICDs) make a variety of demands for MIL-STD-1553 remote terminals (RTs). Among these requirements are the need to ensure data integrity and sample data consistency, the need to perform bulk (multi-message) data transfers, and the need to offload the operation of the host CPU to the greatest degree possible. This latter requirement is reflected in such specifications as CPU spare bandwidth. The latest 1553 terminals provide a variety of choices for performing the different types of transfers. This paper provides a discussion of the hardware and software techniques for achieving these objectives. Three different schemes for RT subaddress memory management are presented: single message, circular buffer, and double buffered. For receive and transmit messages, these include fully synchronous single message transfers, asynchronous single message transfers, and multi-message transfers.
Technical Paper

25-Ah Li Ion Cell for the Mars 2001 Lander

1999-08-02
1999-01-2640
BlueStar Advanced Technology Corporation (BATC) as part of its participation in the USAF/NASA Li Ion Battery Development Consortium has developed a candidate 25-Ah cell for the Mars 2001 Lander. Although the capacity and cycle life requirements for this application are relatively modest, the low temperature performance (−20°C) and pulse discharge requirements (60A) are somewhat more challenging. Geometric requirements within the spacecraft also constrain the cell design leading to a cell with an aspect ratio quite different from those 25-Ah Li ion cells previously developed by BATC. The design of this cell and its compliance with the performance requirements of the mission will be discussed.
Technical Paper

270-Vdc/Hybrid 115-Vac Electric Power Generating System Technology Demonstrator Evolution to a Dual-Channel, More Electric Aircraft Technology Development Testbed

1991-09-01
912183
Sundstrand has been investigating 270-Vdc/hybrid 115-Vac electrical power generating systems (EPGS) technology in preparation for meeting the electrical power generating system (EPGS) requirements for future aircraft (1). Systems such as the one being investigated are likely to be suitable for the More-Electric Aircraft (MEA) concepts presently under industry and military study. The present Sundstrand single-channel testbed is being further expanded to better understand the electrical system performance characteristics and power quality requirements of an MEA in which traditional mechanical subsystems are replaced by those of a “more-electric” nature. This paper presents the most recent Sundstrand 270-Vdc system transient performance data, and describes the modifications being made to the 270-Vdc/hybrid 115-Vac testbed.
Technical Paper

28VDC Brushless Starter Generator Technology

2004-11-02
2004-01-3158
Innovative Power Solutions (IPS), LLC has developed a 300A and a 500A 28 VDC Brushless Wound Rotor Starter/Generator (S/G) system. These systems are capable of replacing brush type S/G or Air Turbine Starters by presenting an adequate Torque vs. Speed performance. The S/G system developed by IPS consists of the Starter/Generator (Motor/Generator) and S/G Control Unit (SGCU).
Technical Paper

3.2 KWH Battery Pack Using 18 Army Standard Lithium ion Rechargeable Batteries

2006-11-07
2006-01-3099
A very high power source solution was developed for the Non Line of Sight Launch System Container Launch Unit (NLOS-LS CLU). The power source solution has been shown to be capable of providing the required 72 continuous hours of operation and high power (3560 watts) to sustain launch capability. The power source consists of 18 BB-2590/U batteries connected in parallel in three layers. Several CLU battery systems have been delivered to the PEO and have been well accepted. The Army is using standard rechargeable batteries, is currently being upgraded with SMBus capability and higher capacity lithium-ion cells. For this reason, the CLU power source has been manufactured with SMBus capability. This paper will discuss the performance of one layer of the CLU power source to simulate the whole power load.
Standard

350 °F Autoclave Cure, Low Flow Toughened Epoxy Prepregs, Type 35, Class 1, Grade 190, Fiber 1

2019-03-12
WIP
AMS3961/3A
The intent of this specification is for the procurement of the material listed on the QPL and, therefore, no qualification or equivalency threshold values are provided. Users that intend to conduct a new material qualification or equivalency program shall refer to the Quality Assurance section of the base specification, AMS3961. All material qualification and equivalency data has been archived and is available for review upon request. Contact the CMH-17 Secretariat (www.cmh17.org) for additional information.
Standard

350 °F Autoclave Cure, Low Flow Toughened Epoxy Prepregs, Type 35, Class 1, Grade 190, Fiber 1

2015-12-02
CURRENT
AMS3961/3
The intent of this specification is for the procurement of the material listed on the QPL and, therefore, no qualification or equivalency threshold values are provided. Users that intend to conduct a new material qualification or equivalency program shall refer to the Quality Assurance section of the base specification, AMS3961. All material qualification and equivalency data has been archived and is available for review upon request. Contact the CMH-17 Secretariat (www.cmh17.org) for additional information.
Standard

350 °F Autoclave Cure, Low Flow Toughened Epoxy Prepregs, Type 35, Class 1, Grade 190, Fiber 2

2015-12-02
CURRENT
AMS3961/2
The intent of this specification is for the procurement of the material listed on the QPL and, therefore, no qualification or equivalency threshold values are provided. Users that intend to conduct a new material qualification or equivalency program shall refer to the Quality Assurance section of the base specification, AMS3961. All material qualification and equivalency data has been archived and is available for review upon request. Contact the CMH-17 Secretariat (www.cmh17.org) for additional information.
X