Refine Your Search

Search Results

Viewing 1 to 11 of 11
Technical Paper

Waste Collector System Technology Comparisons for Constellation Applications

2007-07-09
2007-01-3227
The Waste Collection Systems (WCS) for space vehicles have utilized a variety of hardware for collecting human metabolic wastes. It has typically required multiple missions to resolve crew usability and hardware performance issues that are difficult to duplicate on the ground. New space vehicles should leverage off past WCS systems. Past WCS hardware designs are substantially different and unique for each vehicle. However, each WCS can be analyzed and compared as a subset of ‘technologies’ which encompass fecal collection, urine collection, air systems, and urine pretreatment systems. Technology components from the WCS of various vehicles can then be combined to reduce hardware mass and volume while maximizing use of previous technology and proven human-equipment interfaces. Analysis of past US and Russian WCS are compared and extrapolated to Constellation missions.
Technical Paper

Development of a Rapid Cycling CO2 and H2O Removal Sorbent

2007-07-09
2007-01-3271
The National Aeronautics and Space Administration's (NASA) planned future missions set stringent demands on the design of the Portable Life Support System (PLSS), requiring dramatic reductions in weight, decreased reliance on supplies and greater flexibility for Extravehicular Activity (EVA) duration and objectives. Use of regenerable systems that reduce weight and volume of the space suit life support system is of critical importance to NASA, both for low orbit operations and for long duration manned missions. The carbon dioxide and humidity control unit in the existing PLSS design is relatively large, since it has to remove and store eight hours worth of carbon dioxide (CO2). If the sorbent regeneration can be carried out during the EVA with a relatively high regeneration frequency, the size of the sorbent canister and weight can be significantly reduced.
Technical Paper

Active Thermal Control Systems for Lunar and Martian Exploration

1990-07-01
901243
Extended manned missions to the lunar and martian surfaces pose new challenges for active thermal control systems (ATCS's). Moderate-temperature heat rejection becomes a problem during the lunar day, when the effective sink temperature exceeds that of the heat-rejection system. The martian atmosphere poses unique problems for rejecting moderate-temperature waste heat because of the presence of carbon dioxide and dust. During a recent study, several ATCS options including heat pumps, radiator shading devices, and single-phase flow loops were considered. The ATCS chosen for both lunar and martian habitats consists of a heat pump integral with a nontoxic fluid acquisition and transport loop, and vertically oriented modular reflux-boiler radiators. The heat pump operates only during the lunar day. The lunar and martian transfer vehicles have an internal single-phase water-acquisition loop and an external two-phase ammonia rejection system with rotating inflatable radiators.
Technical Paper

The Extended Duration Orbiter Waste Collection System

1990-07-01
901291
A new waste collection system (WCS) is undergoing development for use in the extended duration orbiter (EDO). Requirements for missions up to 18 days and the capability for missions up to 30 days necessitate the development of a new WCS that will have the appropriate capacity. The new system incorporates design features from both Skylab and Space Shuttle Orbiter WCSs. For urine collection, airflow is used to entrain the fluid and transport it to the phase separator where it is separated from the airflow and pumped to the waste water tank. For fecal collection, airflow is used to transport the waste into a collection bag. After use, a plastic lid is installed on the bag, and the bag and contents are compacted. The system for EDO utilizes redundant fans and urine separators. Plans call for the new WCS to be implemented for OV-105 (Endeavor) as well as for EDO. This paper describes the design and development status of the new WCS.
Technical Paper

Development of Urine Receptacle Assembly for the Crew Exploration Vehicle

2008-06-29
2008-01-2144
The Urine Receptacle Assembly (URA) initially was developed for Apollo as a primary means of urine collection. The aluminum housing with stainless steel honeycomb insert provided all male crewmembers with a non-invasive means of micturating into a urine capturing device and then venting to space. The performance of the URA was a substantial improvement over previous devices but its performance was not well understood. The Crew Exploration Vehicle (CEV) program is exploring the URA as a contingency liquid waste management system for the vehicle. URA improvements are required to meet CEV requirements, including consumables minimization, flow performance, acceptable hygiene standards, crew comfort, and female crewmember capability. This paper presents the results of a historical review of URA performance during the Apollo program, recent URA performance tests on the reduced gravity aircraft under varying flow conditions, and a proposed development plan for the URA to meet CEV needs.
Technical Paper

Development of a Test Protocol for Spacecraft Post-Fire Atmospheric Cleanup and Monitoring

2009-07-12
2009-01-2470
Fire detection, post fire atmospheric monitoring, fire extinguishing, and post fire atmospheric cleaning are vital components of a spacecraft fire response system, Preliminary efforts focused on the technology evaluation of fire detection, post fire atmospheric monitoring and post fire cleanup systems under realistic conditions are described in this paper. While the primary objective of testing is to determine the performance of a smoke mitigation filter, supplemental evaluations measuring the smoke-filled chamber handheld Commercial Off The Shelf (COTS) atmospheric monitoring devices (combustion product monitors) are conducted. The test chamber consists of a 1.4 cubic meter (50 cu. ft.) volume containing a smoke generator.
Technical Paper

Rapid Cycling CO2 and H2O Removal System for EMU

2006-07-17
2006-01-2198
Future National Aeronautics and Space Administration (NASA)-planned missions set stringent demands on the design of the Portable Life Support Systems (PLSS), requiring dramatic reductions in weight, decreased reliance on supplies and greater flexibility on the types of missions. Use of regenerable systems that reduce weight and volume of the Extravehicular Mobility Unit (EMU) is of critical importance to NASA, both for low orbit operations and for long duration manned missions. TDA Research, Inc. (TDA) is developing a high capacity, rapid cycling sorbent to control CO2 and humidity in the space suit ventilation loop. The sorbent can be regenerated using space vacuum during the EVA, eliminating all duration-limiting elements in the life support system. This paper summarizes the results of the sorbent development and testing, and evaluation efforts.
Technical Paper

Corrosion Testing of Brazed Space Station IATCS Materials

2004-07-19
2004-01-2471
Increased nickel concentrations in the IATCS coolant prompted a study of the corrosion rates of nickel-brazed heat exchangers in the system. The testing has shown that corrosion is occurring in a silicon-rich intermetallic phase in the braze filler of coldplates and heat exchangers as the result of a decrease in the coolant pH brought about by cabin carbon dioxide permeation through polymeric flexhoses. Similar corrosion is occurring in the EMU de-ionized water loop. Certain heat exchangers and coldplates have more silicon-rich phase because of their manufacturing method, and those units produce more nickel corrosion product. Silver biocide additions did not induce pitting corrosion at silver precipitate sites.
Technical Paper

Shuttle Waste Management System Design Improvements and Flight Evaluation

1986-07-14
861003
The Space Shuttle waste management system has undergone a variety of design changes to improve performance and man-machine interface. These design improvements have resulted in more reliable operation and hygienic usage. Design enhancements include individual urinals, increased urine collection airflows, increased solids storage capacity, easier access to personal hygiene items, and additional wet trash stowage. The development and flight evaluation of these improvements are described herein. The Space Shuttle Orbiter has proved to be an invaluable test bed for development and in-flight evaluation of life support and habitability concepts which involve transport or separation of solids, liquids, and gases in a zero-g environment.
Journal Article

International Space Station Water System Architecture and Operational Plan

2008-06-29
2008-01-2007
The International Space Station (ISS) is gaining many new capabilities in 2008. The delivery of the United States Operation Segment (USOS) Regenerative Environmental Control and Life Support (ECLS) Systems allow for the ISS crew expansion from 3 to 6 members. The ability to process recovered condensate and produce oxygen from water has been available on the Russian Segment (RS) since the astronauts and cosmonauts have been living on the ISS. The U.S. systems introduce the ability to process urine in addition to condensate greatly reducing the amount of water needed from the ground each year while also reducing the amount of time astronauts need to spend maintaining the systems. However, the interconnectedness of these systems may create operational difficulties and cause the loss of otherwise recoverable water. This paper outlines the current and future USOS and Russian system architectures, system interdependencies and the inter-segment relationships.
Journal Article

International Space Station USOS Crew Quarters Development

2008-06-29
2008-01-2026
The International Space Station (ISS) United States Operational Segment (USOS) currently provides a Temporary Sleep Station (TeSS) as crew quarters for one crewmember in the Laboratory Module. The Russian Segment provides permanent crew quarters (Kayutas) for two crewmembers in the Service Module. The TeSS provides limited electrical, communication, and ventilation functionality. A new permanent rack sized USOS ISS Crew Quarters (CQ) is being developed. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The new CQs will provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, controllable airflow, communication equipment, redundant electrical systems, and redundant caution and warning systems.
X