Refine Your Search

Topic

Search Results

Technical Paper

Verification of Supply Chain Quality for Perishable Tools

2007-09-17
2007-01-3813
Increased emphasis on standardizing processes and controlling variability in production operations includes validating perishable tools used in daily operations. Even though dealing with reputable manufacturers, many factors including communication, custom specifications and personnel turnover can lead to the perpetuation of mistakes if errors are not discovered and corrective action implemented. However, inspection is costly and inspection costs far outweigh many item costs unless considering product defects. A beneficial balance may be obtained by employing statistical sampling techniques similar to ISO 2859 [1] to verify the quality of incoming tools.
Technical Paper

Use of Electromagnetic and Vacuum Forces on Aircraft Assembly

2002-10-01
2002-01-2630
Decades ago our innovative grandfathers developed the first automated riveting machines based on hard automation using kinematics and tools attached to a C-frame. The C-frame serves multiple functions: First, it holds the upper and lower tools in fixed positions relative to each other; second, it translates upper active tooling forces to the lower tool; and third, it embraces the part placed between the upper and lower tool. C-frames and newly developed yoke, ring and gantry machines, used for low level (first, second) fuselage and wing assembly are growing in size to exorbitant proportions to satisfy requirements of larger and larger structures. High costs are dictated by massive kinematics and complex controls that provide stability, precision, and process speed. All this is mainly needed because we have to carry mechanical forces around the part, from upper to lower tool along the C-frame, gantry, yoke, bridge, etc.
Technical Paper

Universal Splice Machine

2007-09-17
2007-01-3782
There is an increasing demand in the aerospace industry for automated machinery that is portable, flexible and light. This paper will focus on a joint project between BROETJE-Automation and Boeing called the Universal Splice Machine (USM). The USM is a portable, flexible and lightweight automated drilling and fastening machine for longitudinal splices. The USM is the first machine of its kind that has the ability not only to drill holes without the need to deburr, (burrless drilling) but also to insert fasteners. The Multi Function End Effector (MFEE) runs on a rail system that is mounted directly on the fuselage using a vacuum cup system. Clamp up is achieved through the use of an advanced electromagnet. A control cart follows along next to the fuselage and includes an Automated Fastener Feeding System. This paper will show how this new advancement has the capabilities to fill gaps in aircraft production that automation has never reached before.
Technical Paper

The Automated NC Mini-Driller

1999-10-06
1999-01-3436
The introduction of a new derivative to an existing aircraft model poses many decisions regarding old versus new. In the case of the introduction of the extended range 767 (the 767-400ER), an entirely new wing design prompted the examination of the then current assembly processes and tooling. The hesitation to build new drill templates for use in the traditional method of second stage wing spar assembly inspired Tool Engineering Management to request the investigation of a low cost automated drilling apparatus. As a result, the Boeing Automated Tools Group and Advanced Integration Technology, Inc. (AIT) developed and implemented mobile numerically controlled mini-drilling machines for post-ASAT I assembly-drilling operations.
Technical Paper

Simulation Enhanced Work Instructions for Aircraft Assemblies

1998-06-02
981861
The Boeing Company is developing and implementing the tools for the 21st Century for product development with their Design Manufacturing and Producibility Simulation (DMAPS) program. DMAPS combines the best of people, hardware and software tools commercially available to develop product and process simulation applications. The DMAPS toolset enhances the process of preparing concept layouts, assembly layouts and build-to-packages. Comprised of an Integrated Product and Process Team (IPPT), DMAPS produces products faster and with higher quality. The result is a process that eliminates costly changes and rework, and provides all IPPT's the tools and training necessary to perform their tasks right the first time. Boeing applies DMAPS tools to a variety of existing and new programs to build more affordable products. Savings goals set forth by the program are shown in Figure 1.
Technical Paper

Radial and Tangential Forces, Tool Motion, and the Formation of Lobed Holes in Drilling

2002-09-30
2002-01-2637
Out-of-round holes are formed as a result of tool motion during drilling. Tool vibration is driven by radial and tangential forces on the primary and secondary cutting edges. These forces in turn depend on the chip loads on each cutting edge, which in turn depend on the position of the tool at the current time and at the time of the previous tooth passage. A preliminary analysis based on balancing the cutting forces and the bending forces on the tool, shows that the characteristic frequencies of motion of the tool in the tool frame are near 3/rev, 5/rev, 7/rev etc. (corresponding to 2/rev, 4/rev, 6/rev) in the workpiece frame. These motions are consistent with the tool motion and hole form errors commonly observed on the shop floor. We will describe procedures for measuring the dependence of cutting forces on chip load, the development of simple equations for lateral motion of the tool, and solutions for the tool's behavior.
Technical Paper

Power Quality Specification Development for More Electric Airplane Architectures

2002-10-29
2002-01-3206
Power quality has become a subject of increased attention for electrical power systems on both commercial and military aircraft. Several power quality guidelines and specification documents exist that govern today's power system operation and the contributing characteristics of electrical load equipment. This paper presents power quality requirements for future Boeing commercial airplanes, driven by advances in aerospace applications of power electronic equipment, increased load demand and complexity, as well as new power system architectures. The influence of new equipment types on electrical system power quality is described including the effects of motor controllers, AC power converters, and large dynamic loads. The impact of power type classifications such as variable frequency AC power and multiple DC voltage levels is also discussed. Simulation results are presented to develop and validate these power quality requirements.
Technical Paper

Post-Flight Sampling and Loading Characterization of Trace Contaminant Control Subassembly Charcoal

2003-07-07
2003-01-2487
Trace chemical contaminants produced by equipment offgassing and human metabolic processes are removed from the atmosphere of the International Space Station's U.S. Segment by a trace contaminant control subassembly (TCCS). The TCCS employs a combination of physical adsorption, thermal catalytic oxidation, and chemical adsorption processes to accomplish its task. A large bed of granular activated charcoal is a primary component of the TCCS. The charcoal contained in this bed, known as the charcoal bed assembly (CBA), is expendable and must be replaced periodically. Pre-flight engineering analyses based upon TCCS performance testing results established a service life estimate of 1 year. After nearly 1 year of cumulative in-flight operations, the first CBA was returned for refurbishment. Charcoal samples were collected and analyzed for loading to determine the best estimate for the CBA's service life.
Technical Paper

Portable Fastener Delivery and Installation System

2003-09-08
2003-01-2953
The Portable Fastener Delivery System or PFDS, has been developed at the Boeing St. Louis facility to streamline the manual fastener installation process. The PFDS delivers various fasteners, on demand, through a delivery tube to an installation tool used by the operator to install the fasteners in an aircraft assembly. This paper describes the PFDS in its current configuration, along with the associated Huck® International (now Alcoa Fastening Systems) installation tooling, as it is being implemented on the F/A-18E/F Nosebarrel Skinning application. As a “portable” system, the PFDS cart can be rolled to any location on the shop floor it might be needed. The system uses a removable storage cassette to cache many sizes and types of fasteners in the moderate quantities that might be required for a particular assembly task. The operator begins the installation sequence by calling for the particular fastener grip length needed using a wireless control pendant.
Technical Paper

Laser Tracker Assisted Aircraft Machining and Assembly

2008-09-16
2008-01-2313
The patented (US 7,277,811 B1) Position Bar provides precise measurement, machining and drilling data for large Engineering and Tooling structure. The Position Bar also supports end item verification seamlessly in the same machining control code. Position Bar measurements are fast, accurate, and repeatable. The true centerline of the machine tool's spindle bearings are being measured to within .002 in a 20 foot cubic volume (20×20×20). True “I”, “J”, & “K” machine tool spindle positions are also precisely measured. Any Gantry or Post Mill Tool can be converted to a Coordinate Measurement Machine (CMM) with this laser tracker controlled Position Bar. Determinant Assembly (D.A.) holes, for fuselage and wing structures are drilled and then measured to within .006 in X, Y, & Z, over a 40 foot distance. Average laser tracker measurement time, per hole, is 2 seconds.
Technical Paper

International Space Station Mobile Dosimetry Unit: A Comparison of Flight Measurements With Model Calculations

2004-07-19
2004-01-2277
Space radiation measurements were made on the International Space Station (ISS) with the Bulgarian Liulin-E094 Mobile Dosimetry Units (MDU) during 2001. The Liulin-E094 was part of the Dosimetric Mapping experiment lead by Dr. G. Reitz, DLR. Four MDUs were placed at fixed locations: one unit in the ISS “Unity” Node-1 and three units were located in the US Laboratory module. Space radiation flight measurements were obtained during the time period May 11 – July 26, 2001. In this paper we discuss the development of an MDU shielding model using combinatorial geometry and 3-D visualization and the orientation and placement at the four locations within the ISS. Four shielding distributions were generated for the combined ISS and MDU shielding models. The AP8MAX trapped proton model was used to compute the daily absorbed dose for the four MDUs and are compared with the flight measurements.
Journal Article

Integrated Ball-Screw Based Upset Process for Index Head Rivets Used in Wing Panel Assembly

2015-09-15
2015-01-2491
A new high speed forming process for fatigue rated index head rivets used in wing panel assembly using ball-screw based servo squeeze actuation has been developed. The new process is achieved using a combination of force and position control and is capable of forming to 40,000 lbs at rates of up to 200,000 lbs/second whilst holding the part location to within +/− 10 thousandths of an inch. Multi-axis riveting machines often have positioning axes that are also used for fastener upset. It is often the case that while a CNC is used for positioning control, another secondary controller is used to perform the fastener upset. In the new process, it has been possible to combine the control of the upset process with the machine CNC, thus eliminating any separate controllers. The fastener upset force profile is controlled throughout the forming of the rivet by using a closed loop force control system that has a load cell mounted directly behind the stringer side forming tool.
Technical Paper

ISS: On-Board ECLSS Maintenance Activities and Launch Logistics

2006-07-17
2006-01-2062
The ISS U. S. ECLSS contains replaceable component designs to facilitate maintenance. A replaceable component is referred to as an Orbital Replacement Unit (ORU). Total U. S. ECLSS maintenance events that have occurred over the five years (2001-2005) of operations are summarized. A more detailed description is provided for the ECLSS Remove and Replace (R&R) maintenance activities that have occurred during the last two years and the associated logistics that supported these activities. Maintenance activities have replaced failed or degraded ORU's by Corrective Maintenance (CM) and replaced spent expendable ORU's by Preventative Maintenance (PM). Corrective maintenance is performed only when necessary and often on relatively short notice. Preventative maintenance is planned in advance and is normally performed at a specified ORU service time. The paper also describes activities and successful efforts to increase the expendable ORU service life.
Technical Paper

Human Swept Volumes

2004-06-15
2004-01-2190
The Human Swept Volume (HSV) software described here is an interactive tool that allows users to position and animate articulated human models and then generate tessellated swept volume solids. Inverse kinematics and keyframe interpolation are used to define motion sequences, and a voxel-based method is used to create swept volume solid models. The software has been designed to accept various human anthropometry models, which can be imported from other CAD tools. For our initial implementation, we defined several human models based on dimensions from CAESAR/SAE anthropometric data. A case study is described in which the swept volume software was used as a part of a human space occupancy analysis. Results show the advantages of using complete swept volumes for objective measurement comparisons.
Technical Paper

Haptics, Instrumentation, and Simulation: Technologies for Enhanced Hand Drilling Training

1999-06-05
1999-01-2283
A fundamental part of airplane manufacturing involves hand drilling of holes for fasteners (bolts and rivets). The integrity of a fastener depends on the quality of its hole, which must be properly positioned, have a circular diameter of correct dimension, and be free of surface flaws and contaminants. A common method of drilling training is for a student to drill holes under the supervision of an instructor who inspects or measures the holes and makes suggestions for improving technique. This training method has proven to be effective, but it is time-consuming and requires considerable personal attention. We have devised instrumentation to monitor critical parameters (drill orientation and forces) so that a student can receive instantaneous visual feedback. This real-time feedback provides the student a better understanding of the drilling process and allows him or her to quickly make improvements.
Technical Paper

Flight Crew Training - A Total Concept

1971-02-01
710474
To serve the requirements of the operational environment of modern jet aircraft, the flight crew training program should be kept as simple as possible and be consistent with the total information system for aircraft operation of which it is a part. Systematic tools are described which assist the course developer in optimizing the implementation of Specific Behavioral Objectives, allocating learning elements to the most cost effective learning environment, and organizing those learning elements associated with the classroom environment. Included is a discussion on the management systems applied, the development of a Learning Task Analysis, and a systems approach to course organization.
Technical Paper

Flexible Assembly System Implementation

1999-10-06
1999-01-3447
This paper covers issues related to the installation, testing, and production implementation of a large-scale automated wing drilling/fastener installation system. Emphasis is placed on describing the production process, foundation requirements, axes alignment, calibration, testing and implementation. Description will include key hardware features such as the multi-function end effector and spindle end effector. The objective is to convey the complexity of implementing this system as well as reviewing the lessons learned from this experience.
Technical Paper

Fasteners Modeling for MSC.Nastran Finite Element Analysis

2000-10-10
2000-01-5585
The distribution of loads between the components of a structural assembly depends not only on their dimensions and material properties but also on the stiffness of fasteners connecting the components. So, the accuracy of the finite element analysis is influenced much by the fastener representation in the model. This paper describes an approach designed specifically for joints with connected plates modeled by shell elements located at plates mid planes. The procedure is based on definition of independent components of a fastener joint flexibility, analysis of each component, and their assembly to represent a complete plate-fastener system of the joint. The proposed modeling technique differs from the traditional approach where all the connected plates are modeled coplanar. The traditional approach is based on calculating a single spring rate for a particular combination of fastener and plate properties.
Technical Paper

Efficient Assembly Integration and Test (EAIT) Moves Theory to Practice at a System Level to Effect Lean Outcomes on the Shop Floor

2009-11-10
2009-01-3169
This paper will describe the Efficient Assembly Integration and Test (EAIT) system level project operated as a partnership among Boeing business units, universities, and suppliers. The focus is on the successful implementation and sharing of technology solutions to develop a model based, multi-product pulsed line factory of the future. The EAIT philosophy presented in this paper focuses on a collaborative environment that is tightly woven with the Lean Initiatives at Boeing's satellite development center. The prototype is comprised of a platform that includes a wireless instrumentation system, rapid bonding materials and virtual test of guidance hardware there are examples of collaborative development in collaboration with suppliers. Wireless tools and information systems are also being developed across the Boeing Company. Virtual reality development will include university partners in the US and India.
Technical Paper

ESM Analysis of COTS Laundry Systems for Space Missions

2002-07-15
2002-01-2518
Clothing supply has been examined for historical, current, and planned missions. For STS, crew clothing is stowed on the orbiter and returned to JSC for refurbishment. On Mir, clothing was supplied and then disposed of on Progress for incineration on re-entry. For ISS, the Russian laundry and 75% of the US laundry is placed on Progress for destructive re-entry. The rest of the US laundry is stowed in mesh bags and returned to earth in the Multi Purpose Logistics Module (MPLM) or in the STS middeck. For previous missions, clothing was supplied and thrown away. Supplying clothing without washing dirty clothing will be costly for long-duration missions. An on-board laundry system may reduce overall mission costs, as shown in previous, less accurate, metric studies. Some design and development of flight hardware laundry systems has been completed, such as the SBIR Phase I and Phase II study performed by UMPQUA Research Company for JSC in 1993.
X