Refine Your Search

Search Results

Viewing 1 of 1
Journal Article

NODE 3 & CUPOLA Thermal Analysis Campaign for Design Verification and Operations Definition

2009-07-12
2009-01-2454
In the frame of the International Space Station (ISS) development plan, TAS-I was in charge of manufacturing, integrating and testing several manned modules like American USOS MPLMs, Nodes 2, Node 3 and Cupola in addition to the European manned modules Columbus and ATV. Based on the current ISS assembly sequence, Cupola, which is considered a US Governed Furnished Equipment (GFE) of Node 3, will be launched mated to the Node 3 active axial port in the NSTS 20A mission, beginning 2010. After NSTS docking and Node 3/Cupola berthing to N1 Port port, Cupola will be moved and permanently located to the N3 Nadir port to support ISS operations (e.g. Japanese HTV docking maneuvers to N2). Thermal design for Cupola consists of passive protections from launch up to its permanent location and active/passive controls when permanently mated to N3.
X